20080603143342.pdfDATE: June 3, 2008 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Jay Fogarty FAX: 360-387-8148 FROM: Ann Bullis, Assistant Building Official RE: Plan Check: 2008-0362 Project: Smith Addition Project Address: 815 Puget Way During re -review of the plans for the above noted project, it was found that the resubmittal was very incomplete and a second review could not be done. Please provide written responses to all of the previous comments and provide structural calculations for the design (including lateral or alter to meet conventional construction). Please submit revised plans/documents to Marie Harrison, Permit Coordinator. Eagle Eye Consulting Engineers, P.S. PO Box 523 OIalla, WA 98359 hoytjeter@centurytel.net 364 874 0562 Fax 360 874 0599 To: Mage Harrison 121 5t' Ave N Edmonds, WA 98020 Re: Smith Residence 815 Puget Way Edmonds, WA 98020 Plan Review # 2008-0362 EECE # EDM 0847 Plan review number 01 Structure Stated Area S.F. Stated first floor 2800 New First Floor 475 Total 3275 Deck first floor 340 Grand total 3615 �..� R � s . r„ ErED MAY 2 9 2;",,"`3 BUILDING DEPT. The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, Ordinance, Ventilations and Indoor Air Quality, and Energy requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 4 Pian Review Number 01 EECE#: EDM 08-47 Smith Residence 2008-0362 ORDINANCE COMMENTS General 1. Please note pressure treated wood shall be used or provide a vapor barrier for the wood next to the concrete shown on sheet 3. R319 2. Please provide a section through the building in order to complete the review. It is not clear how the new and the existing interface_ A section would clarify this. Alternative add details to show how the existing and new will be connected and flashed, etc. 41 l.✓�c�i� � ��c�rzr�i��.f��J ��/A��"'�7�� �Cdrd /sy /lOGs�J. Sheet Elevations 3. It appears there is going to be a new deck but it is not clear how this will be access. Please clarify this on the drawings. STRUCTURAL COMMENTS General 4. Please clarify the required connection of the deck ledge and the connections of the joist to this ledger. Nails cannot be used for the connections of the ledger to the main structure. Please add this information to the drawings. R502.2.2 Sheet 1 Foundations and Floor Framing Plan 5. Submit analysis for 7 kips force being applied at the edge of the walls continuous footing. Per check analysis, the footing should be larger at this location not to overstress the soil. Please modify accordingly. 6. Please specify the required connections of the gusset plate noted for the post to beam connections. Sheet 3 just notes 2x4 gusset 7. The drawing note for 4x8 beam post down to footing. What is the post that will be used? How will it be connected at the base and the top? Please add this to the drawings. 8. Please specify the required lateral diaphragm connections at the house where the floor framing comes out. Currently there is only walls shown ate the three sides but the house sides also has to transfer the lateral forces. Please add this to the drawings. Page 3 of 4 PIan Review Number Ot EECE#: EDM 08-47 Smith Residence 2008-0362 9. Please specify the required support at each end of the 4X10 beam shown supporting the floor. 10. Please note the species of TSI joist being used for the floor system. All that is noted is the depth and the spacing. Sheet 2 Elevations 11. The drawings show a wall -bearing wall being DEMO but it isnot clear if this was a bearing wall or not. The framing runs perpendicular to this wall. Please note that this is not a bearing wall and clarify what is going to support the force of the existing trusses and deck joist. Sheet 3General Notes 12. Please modify the wind to reflect the current adopted code. 80 mph was the UBC . and not the IBC/IRC. Please modify accordingly. VENTILATION AND INDOOR AIR QUALITY CONTROL COMMENTS Since less then 500 square feet is, being added the conditions floor space is exempt form the whole house fan requirements. Sheet 1 Foundations and Floor Framing Plan 13. Please specify the required fan to be used in the new bathroom shown on this sheet. WSV&IAQC 303.3.1 14. All habitable room must have minimum required ventilations. Since this room is not a sleeping room but still habitable please either specified mechanical ventilations or specify which window w is operable. R301.1 ENERGY COMMENTS Sheet 3General Notes 15. Please modify the window U value to state U=.35 and not U=.4. This was changed in the state adopted energy code. WSEC Table 6-1 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications Page 4 of 4 Pian Review Number 01 EECE#: EDM 0847 Smith Residence 2008-0362 or additional corrections may be required subsequent to the Building Department pian review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt 3eter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. Hoyt Teter, P.E. President