Loading...
20080610140540.pdfEagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 j hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison 1215' Ave N Edmonds, WA 98020 Re: Grimm Residence 530 9" Ave N Edmonds, WA 98020 Plan Review # 2008-0394 EECE # EDM 08-51 PIan review number 01 Structure Stated Area S.F. Finished Basement 616 xisdng First floor 1495 New First Floor 331 ExisN 2nd Floor 730 New 2" Floor 523 Total 3695 Garage 644 Total 4339 Deck First Floor 320 Deck Upper Floor 96 Grand total 4755 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, Ordinance, V&IAQC, Energy requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 6 Plan Review Number 01 EECE#: EDM 08-51 Grimm Residence 2008-0394 ORDINANCE COMMENTS General 1. Please provide a plan of the "as built" structures, It is not clear what is being added and what was existing based off the drawings submitted at this time. 2. Please note on the drawings that the smoke alarms shall be hot-wired with a battery back up. 8313.2 3. Show fire blocking at the stud wall were the ledger & floor diaphragm is attached to the stud. R602.8 4. Architect of Record (AOR), please clarify on the drawing the required roof ventilations. I was unable to determine this from the drawings. R806 5. AOR please specify the locations of the roof drains and their required size. R 903.4 6. Usable space under stairways shall have the walls and soffits on the enclosed side protected with a minimum of V2 -Gypsum. Please add this to the drawings. R311.2.2 7. Provide a detail of the step flashing at the roof/wall. R703. 8. AOR please specify the hot water tanks shall be strapped to resist lateral displacement as required per M1307.2. Sheet 3 Foundations Plan, Basement Wall Detail, Shear wall Schedule 9. One crawl space vent shall be with in 3 feet of each corner. This is not reflected on the drawing submitted. For example, the crawl space under the den. Please modify accordingly. Sheet 4 Basement Floor Plan, Energy Notes 10. Please note the window at the bathtub in bathroom. #2 shall be tempered. R30.8.4 11. Please specify the required light activation at the top and bottom of the stairs, per R303.6.1. 12. Please specify that all the penetrations through the garage to house separation wall shall be protected by filling the opening around the penetrating item with approved material to resist the free passage of flame and products of combustion. 8309.1.2 Page 3 of 6 Plan Review Number 0 EECE4: EDM 08-51 Grimm Residence 2008-0394 Sheet 5Main Floor Plan, General Notes 13. Please provide a detail of the guardrail. IRC 312 and Table 301.5 14. Please note the window next to the entry door shall be safety glazed. R308.4 15. Usable space under stairways shall have the walls and soffits on the enclosed side protected with a minimum of 1/2 -Gypsum. Please add this to the drawings. R311.2.2 16. Please add the information for the handrails for the exterior stairs. 8311.5 17. Please clearly add to the drawing the required riser height for the exterior stairs. R311.5.3 18. Please provide a handrail detail. R311.5.6.2. 19. AOR, please add guardrail details on the drawings to show compliance with the code. R312 20. PIease clarify the locations of the smoke alarm on this level. One is required on each level. R313.2 item 3 21. Please clarify on the drawing how the dryer will be vented to the outside. The vent shall not be with 3 feet of any opening in the wall. Please add this information to the drawings. M1502.2 Sheet 6 Upper Floor Plan 22. Note minimum required finish wall material & height in the shower & bath areas. R307.2. 23. Please provide detail for the construction of the new deck off the master bedroom. Cross Section A/2 just shows this schematically. 24. AOR, please add guardrail details on the drawings to show compliance with the code. Verify attachments to the structure with minimum required lateral loading R312 Page 4 of 6 Plan Review Number 01 EECE#: EDM 08-51 Grimm Residence 2008.0394 STRUCTURAL COMMENTS General 25. Engineer of Record (EOR), the 5-1/8X 9 over the den has a moment at the support greater then what was used for the design. The design moment appears to be 126.701 kip -feet at the support but the mid span has 109.8 kip -feet, which was used to size the beam. In addition, the allowable bending stress for 24V4 -1.8E is 1850 psi on the top lam. Please modify accordingly. NDS table SA and table 5.3.1 26. The first floor framing required a 24FV8 for continuous 5-1/8X13.5. Please add this information to the drawings or submitted analysis to justify not required. 27. There is no information for the attachment of the deck ledger. Please add this information to the drawing. R502.2.2 28. Please specify the required roof diaphragm nailing. I was unable to fend where this information was specified. Table IRC 503.2.1.1(1) Sheet 1 North and East Elevations 29. Please provide details and analysis for the new deck being added on the sloped grade. Details are required for these connections. Sheet 3 Foundations Plan, Basement Wall Detail, Shear wall Schedule 30. EOR, please provide analysis for the anchor bolts spaced @ 4'O/C center to resist the reaction from the concrete wall retaining the soil. Per check analysis, it appears the top will not be able to resist the design force. Please submit analysis to justify. 31. EOR, please submit analysis for the foundation system to support the design loads. This was not in the submitted documents at this time. 32. EOR, please clarify the footing size at the porch area. The exterior is specified as 24" Square X 10" thick but the other footing is not noted. Please add this information, in order to check the footing at this location.. Sheet 4 Basement Floor Plan, Energy Notes 33. EOR, please submit a geotechnical report to justify a allowable soil bearing pressure of 3000 psf as noted on the drawings. 34. EOR provide analysis for the beam pocket supporting the 5-1/8X13-112 glb at the garage. This also should include the connections required. Page 5 of 6 Plan Review Number 01 EECE##: EDM 08-51 Grimm Residence 2008-0394 Sheet 6 Upper Floor Plan 35. Please clarify the framing at the deck off bedroom #2. Nothing is specified for required connections to support the design loads. See section D/8. Sheet 7 Framing Plans, Roof, Upper Floor & Main Floor 36. EOR, please specify the required joist hanger to support the joist. All that is noted is joist hanger. 37. EOR, please specify the required deck joist hanger. Nothing is specified at this time. 38. Upper floor Framing Plan: Based off the cantilever and the last joist there will be uplift at the deck joist connections. Please clarify on the drawings how this force will be resolved. Nothing is specified at this time. 39. Main Floor Framing Plan: Please provide analysis and specified the required connection of the sister 2x10 at the cantilevering deck. 40. Nothing is specified for the connections of the roof joist to the supporting member. Please add this information to the drawings in order to complete the review. 41. Please clarify on the drawings how the glu-lam ridge beam is being supported and the required connections. Nothing is specified at this time. 42. Please provide a detail at the intersections of the 2X 10 ridge beam to the 5- 1l8X10-1/2 GLB. 43. EOR please specify the required hanger for the 2x8 ceiling joist to support the design loads. Nothing is specified at this time and these are being hung off the glu- lam beam. 44. Main Floor Framing pian: EOR, please specify the required connection of the 2x10 rim joist to the supporting 2x10 floor joist. Nothing is specified at this time how the design forces will be resolved. 45. Main Floor Framing Plan: EOR, please specify the required hanger to use at 2x10 back span supporting member. 46. Roof Framing Plan: EOR, please specify the required hanger for the 2x8 roof framing joist. Page 6of6 Plan review Number 01 EECE#: EDM 08-51 Grimm Residence 2008-0394 Sheet 8 Building Section @ Stair, Section @ Den/Kitchen 47. Sections at Den/Kitchen: EOR, please clarify how the rafter joist will be connected at the existing wall. Nothing is specified at this time. 48. EOR, please provide detail for the beam pocket supporting the beam. Nothing is. specified at this time. 49. Please note the required 90 -degree hook for the vertical reinforcement into the footing. WSA R403.1.1 VENTILATION AND INDOOR AIR QUALITY CONTROL COMMENTS Sheet 5Main Floor Plan, General Notes 50. Please specify the required fan for the kitchen. WSV&IAQC 303.3.2 ENERGY COMMENTS Sheet 3 Foundations Plan, Basement Wall Detail, Shear wall Schedule 51. Vapor barrier in the crawl space shall lap a minimum of 12". Please note this on the drawings. WSEC 502.1.6.7 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt 3eter, P.E. President