Loading...
20080617110826.pdfO EFE pE 0 V i'`Ft ?"i� t�c{'�e&�➢B`I€Ei'Q�s1Si( �St. 189 DATE: June 17, 2008 TO: Megumi Matsumura CDA Architects megumim@cdaarch.com FROM: Ann Bullis, Assistant Building Official RE: Plan Check: BLD2008-0319 Project: Nordic Center Project Address: 310 5'h Ave S During review of the plans for the above rioted project, it was found that the following information, clarifications or changes are needed. Please provide written responses to each comment as to how it has been addressed, and where changes can be found on the plans. Please submit revised plans/documents to Marie Harrison, Senior Permit Coordinator. Many of these items were brought to your attention in the Preapplication Comments for this project. 1. Codes in effect at the time of this meeting a. 2006 International Building Code (including Accessibility) with State Amendments b. 2006 International Mechanical Code (including International Fuel Gas Code) with State Amendments c. 2006 International Fire Code with State Amendments d. 2006 Uniform Plumbing Code with State Amendments e. 2006 Washington State Energy Code (WAC 51-11) f. 2006 Washington State Ventilation Indoor Air Quality Code (WAC 51-13) g. Edmonds Community Development Code 2. List all deferred submittals on the cover sheet of the plans. The City prefers that mechanical and plumbing plans be included with and issued with the main building pen -nit to help avoid any construction delays. Common deferred items are fire sprinkler, fire alarm, signs, side sewer, water meter, shop drawings, State electrical, State elevator, etc. 3. Clarify on the floor plans and scope of work if you intend for the office and retail spaces, including break room, to be shell -core only or if they will be completed under this permit. For shell -core, all fire, life -safety, ventilation, and restroom facilities must be complete. 4. On detail 21A0.3, show the actual grade plane calculations and elevations. As noted in the preapplication comments, this is typically shown and demonstrated on the building elevation views and site plan. 5. Shoring design and calculations are required, and will require peer review at full cost to the applicant. This was brought to your attention during the preapplication meeting. Coordination must be made between all design professionals for the shoring design. The geotech report dated April 26, 2003 notes that shoring is required and anticipates standard cantilevered soldier piles with lagging, as well as ecoblock shoring. Plans and calculations must be stamped and signed by a State Licensed Professional Engineer. 6. Provide a letter from the Geotechnical Engineer of Record (Dennis Bruce, P.E.) that he has reviewed the proposed plans for the project and finds them consistent with the recommendations in his report, or submit amendment to the geotechnical report addressing issues. 7. Clearly show that drainage for the shoring walls will be located on the subject property. 8. Any work to be done on adjacent properties or street or alley to accommodate the grading and shoring must be clearly shown on the plans. Provide construction easements for work to be done on either the north or south private properties. If grading in excess of 50 cyds will be done on the north or south private properties, separate permits are required with each permit application signed by the respective owner. 9. Revise allowable area calculations on Sheet A0.2 as follows: Use 7000 for base allowable area (not 9000 since you are using nonseparated uses); show the calculation for the sprinkler increase; show the calculation for the multi -story increase. 10. On the site plan, dimension the 16' wide alley and 8' to centerline for calculation of openings in west wall. 11. On the site plan, clearly show, label, and dimension all encroachments into the public right of way. Contact Marie Harrison. Permit Coordinator for Encroachment Permit information. 12. The north and south sides of the dwelling unit decks are considered openings. The 1 -hour exterior wall and parapet must extend through these areas to the face of the building. Revise all affected plans. 13. Dimension depth of light well areas along the north and south sides of the building. 14. Revise allowable opening calculations 1/A0.3: The light wells scale to 4-6" on the plans, therefore only 15% glazing is permitted per IBC Table 704.8. 15. Make a note on the plans in the 5 light well locations that "use of this area as a deck is not permitted": Sheet A2.2, A2.3, A2.4, A3.2, 4/A6.3, etc. where the light wells are shown. 16. The exterior walls of the setback portions of the building that are less than 10 feet from the property line must still have parapets unless and exception is used (TBC 704.11). For example detail 4/A6.3. Revise plans accordingly. 17, On details 19 & 20 sheet A8.2, note the minimum height of the parapet, revise to show the uppermost 18" of the parapet will have a non-combustible face, and show the property line in relation to the architectural projections (also see next comment). IBC 704.11.1 18. Projections from the exterior wall on the north and south sides of the building are not permitted, . except as allowed in IBC 704.2 and 1406. Revise plans accordingly. 19. Many of the wall type symbols are missing from the second floor plan, and missing from the stair enclosure and elevator shaft of the 15t floor, and missing from the elevator shaft on the basement floor. Please provide so code compliance can be verified. 20. Label the trash room on the basement floor plan. 21. Label the elevator on all floor plans. 22. At the trash room area on section 2/A6.2, label and clarify the object shown outside of the trash room. 23. Note on the floor plans if the water heaters will be gas or electric. 24. On Sheet A0.2, for each floor please dimension maximum overall diagonal dimension and distance between exits. 25.2 exits are required from the basement floor (WAC 51-50 1019.1) spaced apart 113 the maximum overall diagonal dimension of the floor. Both exits must be accessible per TBC 1007. Page 2 of 5 26. On Sheet AM, the 'T1 a" direction exit signs will likely confuse occupants and need to either be removed or relocated to truly direct occupants to the required exits. 27. On the reflected ceiling sheets, note the method of power backup for the exit signs. 28. On Sheet A3.2: a. Add the NL fixtures to the legend and note the method of power backup b. Add emergency lighting at each exit and also in the stairways. c. On the second floor, add exit sign over east exit stair, and add emergency lighting symbols in the corridor area. 29. On the basement floor plan, a self-closing 60 minute rated door is required to separate the vertical stair enclosure from the horizontal i -hour exit passageway. IBC 1020. 1.1 30. Label the 1 -hour exit passageway on the basement floor plan. 31. Clearly show on the floor plans and sections that the floor -ceiling of the exit passageway and stair enclosure are 1 -hour rated and cross reference the fire rated detail on the plans. 32. Stair 3 at the northwest corner of the basement floor is also part of the I -hour exit passageway until it breaks the vertical plane of the exterior of the building. The walls and ceiling must be I - hour construction. 33. Provide section through floor of landing at Stair 3 showing catch basin lid flush with the floor surface, slip resistant surface, and supporting 100 psf minimum for egress. 34. The proposed roof drain at stair 3 is not permitted within the required minimum stair landing area and penetrations in the 1 -hour exit passageway are not permitted except for those specifically serving the exit passageway (IBC 1021.5). 35. Penetrations in the 1 -hour stair enclosure (Stair 1) are not permitted except for those specifically serving the stair enclosure. 4 &5/A6.4 show a sprinkler pipe in the enclosure. 36. Provide details showing the fire barrier walls extending through to the underside of the floor/roof deck. For example, on details A & B/A6.4. Also at the exit passageway and elevator shaft. 37. Construction supporting the fire barriers (shaft walls, stair enclosure walls) and horizontal assemblies (fire separation between S2 and other occupancies, and at off -sets in stair enclosure) must be 1 -hour rated, including individual protection of columns and beams as applicable (IBC 706.5 711.4, 714.2). Clearly show on the plans and cross reference details. 38. Revise general note 6 on Sheet A2.1 to reference the City of Edmonds. 39. Verify that detail call -outs reference the correct detail and sheet. As an example, on Sheet A6.1, enlarged details of the stair enclosure should reference the details on Sheet A6.4, not 6.2. Also, some are not complete at various locations (e.g. X/A-XX). 40. Door schedule: a. Doors C3 must be self-closing 60 minute rated. b. Door C7 notes "not used" but is referenced at the elevators at all 3 floors. c. See corridor comments below and alter door schedule accordingly. 41. Safety glazing must be shown at the following locations (unable to find on the plans): a. Windows adjacent to all doors at the east building entrances. Also, neither the door or window schedule note these windows (size, U -value, etc.). b. W06 at all dwelling unit decks. 42. The fire rated corridor at the second floor must be maintained down the east stairway to the exterior of the building. Revise door ratings and show on 2/A0.2. 43. Is also appears from the door schedule that you intend the office floor to have a fire rated corridor. Clarify and label. If not, show how the corridor fire rating will be maintained at the opening under the skylight to the floor below. Page 3 of 5 44. On 3/A02 where the % hour rated corridor exception is noted, also note that an STC of 50 is required which requires a more restrictive fire rated assembly (typically 1 or 2 hour). 45. Provide construction details showing how exterior wall transition from one wall type to another will be done to maintain fire rating and for weatherization, and cross reference where they apply on the plans. 46. On the Wall Types, revise to include the specific requirements of the listed and tested assemblies, such as gyp sheathing on the exterior side, type/size/spacing of fasteners, staggered layers, etc. Revise A & Al to specifically note IBC Table 720.1(2) 4-1.1 for siliceous aggregate concrete. 47. Where tub/shower units are located on a fire rated wall, note on the plans that the GC must coordinate inspection of fire stopping and gyp behind the units before installation. 48. Show the type and locations of fire extinguishers. 49. Dimension top and bottom handrail extensions at all stairways on Sheet A6.4 & A6.5. 50. Note the maximum rise on detail 16/A8.2 51. Note on the plans if the stair enclosure and exit passageway will be heated or unheated. If heated, provide slab insulation detail and clearly show insulated wall and ceiling areas separating heated from unheated areas. 52. Revise energy code information on Sheet A0.2 to the 2006 WSEC. Revise the prescriptive values to match updated WSEC Table 6-1 and non-residential values to match the energy calcs submitted. Complete the enclosed EnergyNentilation Worksheets for the upper floor. 53. Relabel restrooms and break room on Sheet A2.2 to their correct use. 54. Dimension minimum accessible maneuvering clearances at doors to offices 103 & 104, restroom 107, corridor side of entry to unit 01 and 04. (ICC/ANSI A117.1 section 404.2.3) 55. At women's restroom Sheet A7.2, dimension the clearance between the corner of the vanity and the wall for occupants to pass. Also, revise height of the toilet seat to 17" min-19"max. (ICC/ANSI Al 17.1 section 604.4) 56. Dimension knee and toe clearance under lavatory (ICC/ANSI Al 17.1 section 306). 57. Revise front view of the restroom to not show an "S" trap under the lay. "S" traps are prohibited. 58. Caution on venting the plumbing for the island sink fixtures and those located near window areas. They must vent directly through the roof or with a loop vent. Air admittance valves are not permitted. Note on plans. 59. Provide skylight details and calcs showing compliance to Chapter 24. 60. Show how ventilation will be provided (IBC 1203.2) 61. Clearly show on the enlarged unit plans that the dwellings will meet Type B accessibility requirements of ICC/ANSI Al 17.1 section 1004 (IBC 1107.6.2.1.2). 62. Revise detail 4/A8.3 to show 60" minimuixa from the parking surface to the bottom of the sign. 63. Provide a plan showing mechanical shafts and general vent paths to the exterior of the building. Where vents and light fixtures will penetrate fire rated assemblies, provide details showing how the fire rating will be maintained (such as with lined joist bays, vertical shafts, soffits below the 1 -hour assembly, etc.). Air handling units are shown above the restroom and break room areas - how will this work? 64. The garage exhaust outlet must terminate per WAC 51-52-501.2.1 #2. Clearly show location and required dimensioned distances on the plans. If a rated shaft will be provided as part of the redesign, please provide a detail and listed and tested fire rated assembly. Also show how the make-up air will be provided for the garage exhaust system - this will be of particular concern since an overhead door is proposed. Page 4 of 5 65. The elevator must meet elevator stretcher requirements of WAC 51-50 3002.4 (effective 411108). Revise elevator size and signage on the plans. 66. Show location of gas meters. 67. This project is subject to RCW 64.55 (EHB 1848), which can be found on the following website http://Mps.log.wa.gov/rew/. a. The following is required: i. Building Enclosure documents stamped and signed by a State licensed Architect or Professional Engineer must be submitted. ii. In addition to the building enclosure plans/details, the design professional must submit a written statement stamped/signed that "The undersigned has provided building enclosure documents that in my professional judgment are appropriate to satisfy the requirements of RCW 64.55.005 through 64.55.090". iii. The building enclosure must be inspected by a qualified inspector and prior to final Building inspection/occupancy, the Building Enclosure Inspector must submit a signed letter certifying that the building enclosure has been inspected in substantial compliance with the building enclosure design documents. 68. Provide guardrail construction details showing construction materials and fasteners meeting loading requirements of IBC 1607.7. 69. On the foundation details, clearly show that foundation drainage will be located on the subject property. Also show the location of permanent shoring in relation to the foundation and property line. 70. Special inspections will be required for: By the Geotechnical Engineer of Record: a. Excavation, grading, and site monitoring including cut slopes b. Shoring installation and monitoring c. Placement of fill and compaction d. Soil bearing verification e. Final letter By WABO Certified Special Inspector(s) f. Concrete, including placement of reinforcement g. Structural steel erection, including welding h. Structural wood, including shearwall nailing (4" o.c. spacing or less), holdowns, bolts installed in concrete, drag struts, bracing, etc. i. Final letter Complete the enclosed Special Inspection and Testing Agreements. One is required for each Special Inspection firm for the project. Have all parties sign the form and return for City approval. 71. Revise General Structural Notes to be applicable to this project. 72. See structural comments from the City's Consultant. Page 5 of 5 Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla,. WA 98359 °^ hoytjeter@centurytel.net 360;874 0562 Fax 360 874 0599 To: Marie Harrison 1215' Ave N Edmonds, WA 98020 Re: The Nordic Center 3105'Ave S Edmonds, WA 98020 Plan Review # 2048-0319 EECE # EDM 08-42 Plan review number 01 Structure Occupancy Gross Area. S.F. Parking Garage/Basement S2 5730 Retail/ First floor M 2176 Office 1 First Floor B 3404 Residential/ 2 nd Floor R2 5395 Total 167€15 Decks 234 Grand total 16939 Sprinklers 16939 C 5580 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following. comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. i EC MAY 2 7 _9; 90 ;:u;E DEPT. Page 2 of 5 Plan Review Number 1 EECE#: EDM 0842 The Nordic Center 2008-0319 STRUCTURAL COMMENTS General 1. For office buildings, the first floor corridor and lobbies shall be designed for a live load of 100 psf but the design submitted was only designed for 50 psf. Please resubmit analysis for the 100 psf. ASCE table 4-1 2. Office buildings are required to be designed for partition loads of no less then 15 psf The design analysis used 10 psf. Please resubmit analysis with the correct partition loads. ASCE 7-05 4.2.2 (Please note the 10 psf was for the older code that not is in effect anymore.) 3. The restrained retaining wall was not designed for the additional 100 psf added to the active pressure. Please resubmit the retrained wall analysis with the 100 psf added as required per the geotechnical report. Please resubmit all restrained retaining walls with the correct active equivalent fluid pleasure. 4. Please submit the geotechnical report with the plot showing the location of the test boring. (The report state see site plan but the site plan does not includes. Also the report shall have this information contained in the report) IBC 1802.6 5. The geotechnical report state the continuous spread footing shall not be less 18" but the detail shows 12". Please modify the detail accordingly. 6. Engineer of Record (EOR), please justify 50 psf live to be used for the parking garage vault lid. The load also of 3000 pound applied over an area of 4.5 inches X 4.5 inches also must be considered. This appears to be able to control the design of the vault lid and not 50 psf. Please modify accordingly. ASCE table 4-1. 7. Please clarify how the stirrup area was determine to be .44 in^2 when there is not any stirrup specified for the vault lid_ Please clarify upon the response. Sheet S1 General Notes and columns and beam schedule 8. EOR, please add to the drawing a statement of special inspections as required per IBC 1705. 9. EOR, please add the pertinent information from the snow load design to the drawings as required per IBC 1603. 1.1 Page 3 of 5 Placa Review Number I EECE#: EDM 08-42 The Nordic Center 2008-0319 10. EOR, please clarify where the 80 mph under wind speed came from. This was the old UBC but the IBC has modified this. Please add all pertinent information per IBC 1603.1.4 to the drawings. IBC 1603.1.4 11. EOR, please add all the required earthquake design date to the drawings as required per IBC 1603.1.5. IBC 1503.1.5 Sheet S-2 Foundations Plan and Details 12. EOR, please specify the footing size and required reinforcement at grid 1 B. 13. Detail 10: EOR, Please provide analysis for ht 1/4" Diameter KWIK bolts. The ESR -1197 does not have this size. The smallest size of bolt is 3/8". Submit ICBO report and analysis for the 1/4" Diameter bolts to transfer the required design forces. Sheet S-3 Lower level shear Walls with First Floor Framing Plan 14. EOR, please provide a detail for the connection for beam mark 27 to the wide Range beam. 15. EOR please specify the required connection of the beam mark 21 to the 8x8x 10" connecter column. The details state 10/S3 but this is for steel column not concrete column. Please modify accordingly. (Note this is referenced other places that do not apply, please clarify what is to be used at this locations in order to complete the review) 16. EOR, please clarify on the drawing the required connection of the floor system to the perimeter concrete walls. Nothing is specified at this time in order to complete the review. 17. EOR, please provide a detail for the bearing wall on the wide flange beam to transfer the design forces. 18. Please add to the plan the lower level shear walls. Nothing is specified at this time. Sheet S-4 First Floor Shear Wall with Second floor Framing Plan 19. EOR, please specify the required post and connections for the 5-1/8X13-112 with a mark of "#" in the hexagon. 20. EOR, please clarify on the drawing the required connections of wide flange beam mark 23 to the diagonal beam mark 5 along grid line Cl between grid 3 and grid 4. Page 4 of 5 Plan Review Number I EECE#: EDM 08-42 The Nordic Center 2008-0319 21. Please modify the shear wall schedule to reflect nails spacing of 2" shall be staggered. IBC table 2306.4.1 footnote e 22. Please add to the drawing for the length of the shear wall on this level. It appears the length used in the analysis does not match the drawings. Please add this required minimum length to the drawings. Sheet S-5 Second Floor Shear walls and Roof Framing Plan 23. The effective width of the Shear wall mark SW4 exceeds the maximum height to width ratios. Please modify accordingly. IBC table 2305.3.4 24. Please add to the drawing the required width of the shear wall notes as required per the analysis. 25. EOR, the beams marks 34 does not match the schedule on sheet on sheet S2. Please clarify the required connection and modify accordingly. 26. EOR, please specify the required connections of the 6x6 post to beam mark 40. Nothing is specified at this time. Sheet S-6 Sections and Details 27. Detail 12: EOR, please provide a detail for the placement of the steel in the concrete column. All that is notes is 2 rows of 3# 5 Vertical with #3 ties at 10" OIC. This should be added to the drawing to show how the ties and vertical steel shall be placed. Detail 5 on this sheet show the column but does not show the required 135 degree hook or correct lap of the tie splice. Please modify accordingly. ( I believe the intent is to use detail 5 but it is not referenced this way) ACI 7.10.5.3 28. Detail 12: Concrete column required closed ties to be used but the detail does not reflect this. Please modify accordingly. 29. Detail 1: EOR, please modify the 44 dowel into the vault lid to meet the development length to transfer the force. A 12" leg will not meet the minimum code development length into the lid. Please modify accordingly. ACI 13.5.4 and ACI figure 13.3.7 Page 5 of 5 Plan Review Number I EECE#: EDM 08-42 The Nordic Center 2008-0319 30. Detail 1, The detail state a 7-112" Slab but the analysis submitted state 12" slab. ( I believe this is just a miss print and the 7.5" as used in the analysis is the depth to the tension steel and the slab is required to be 12", but the details does not reflect this) In addition, the minimum thickness cannot be less then L120, which is 9.6". ACI table 9.5a. 31. Detail 1: EOR, it appears the 10" OC spacing noted for the reinforcement lid will exceed the maximum spacing per ACI 10.6.4, equations 10-4. PIease modify accordingly. Please note as drawn, the longitudinal reinforcement is what is typically used for support of the vertical loads and the transverse reinforcement is the shear reinforcement. The longitudinal spacing must meet these requirements, since this is designed as a one-way slab. It is very important the steel be correctly placed in order to support the loads. Please modify the drawings accordingly. ACI 10.6.4 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. LIM Hoyt Jeter, P.E. President city of edmonds development information Washington State Energy & Ventilation Codes Residential Compliance Worksheets Prescriptive Approach CODES: Edmonds Community Development Code Chapters 19.30 and 19.35 Washington State Energy Code 2006 Edition Washington State Ventilation & Indoor Air Quality Code 2006 Edition The purpose of the State energy code is to provide minimum standards for new or remodeled construction to achieve efficient use and conservation of energy. This handout provides the basic minimum codes for prescriptive compliance. The basic prescriptive approach for energy code compliance is the easiest way to determine or show code compliance. It is a straight takeoff and comparison of total window (glazing) and door opening area versus the heated floor space. The percentage of glazing shown on the enclosed charts determines the minimum U -value of all windows and doors for the project, and the insulation R -value for wall, floor, slab and ceiling insulation. This handout is intended to provide minimum prescriptive compliance and it is not intended as a substitute for the entire State Energy Code. Also included in this packet is a Ventilation and Indoor Air Quality Worksheet. Tighter construction and insulation standards have introduced a vast amount of chemicals and other pollutants into dwellings. The process of natural ventilation has also been greatly reduced due to the required sealing of sheathing at walls and floor levels. The State Ventilation and Indoor Air Quality Code (VIAQ) has been created as a means for bringing in fresh outdoor air, and exhausting interior stale air. The VIAQ code allows either a manual portal system or a mechanical system that runs unmonitored on a timer to convey the air. Norms and additional information about the State Energy and Ventilation Codes can be found on the WEB at www.ener,gy.wsu.edu. PLEASE COMPLETE THE FOLLOWING ATTACHED ENERGY AND VENTILATION WORKSHEETS AND SUBMIT TWO (2) COPIES WITH YOUR BUILDING PERMIT APPLICATION. Revised 7107 OV to CITY OF EDMONDS ENERGY & VENTILATION FSS $9a RESIDENTIAL COMPLIANCE WORKSHEETS PRESCRIPTIVE APPROACH PLEASE COMPLETE THE FOLLOWING ENERGY AND VENTILATION WORKSHEETS AND SUBMIT TWO (2) COPIES WITH YOUR BUILDING PERMIT APPLICATION. DATE PROPERTY ADDRESS PROPERTY OWNE JOB TYPE ❑ New ❑ Addition ❑ Remodel (check all that apply) ❑ Single Family . ❑ Multi -Family It Units HEATED FLOOR AREA Existing New Total HEATING BY ❑ Gas ❑ Electric ❑ Other SYSTEM TYPE ❑ Forced Air Furnace Hydronic: Infloor ❑ ❑ Wall heaters Radiant ❑ ❑ Other FOR CITY USE ONLY PLAN REVIEW # DATE OF REVIEW MAXIMUM GLAZING % COMPLIANCE OPTION WHOLE HOUSE VENTILATION SYSTEM TYPE: MANUAL PORTIWINDOW VENT WITH EXHAUST FAN INTEGRATED FORCED -AIR FURNACE COMMENTS: Revised 7107 2006 WSEC Chapter 6 Qualification Form- Zone I Residential Prescriptive (Chapter 6) Options For All Heat Sources Instructions: �are£utly review the requirements for each of the options below. Choose an option that best suits your dwelling design. Glazing percentage typically ietermines which option to choose. Your building must match the selected option requirements without exceptions or substitutions. Disregard components or ,quipment that does not apply to your project- Your permit will be processed more efficiently if you provide all of the requested information. Department staff :an help you with general questions about this form. Proposed designs which cannot meet the specific requirements of a listed option above may calculate ;omphance by Chapter 4 or 5 of the 2006 Washington State Energy Code. Forms can be found on the WEB at WWW.ENERGY. WSU.EDU Reference Case O. Nominal R -values are for wood frame assemblies only or assemblies built in accordance with Section 60 € -l. I. Minimum requirements for each option listed- For example, ifa. proposed design has a glazing ratio to the conditioned floor area of 13% it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed design which cannot meet the specific requirement of a listed option above may calculate compliance by Chapter 4 or 5 of this Code. 2. Requirements applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3. 'Adv' denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the ceiling and the underside of the roof sheathing is less than 12 inches and (b) there is a minimum 1 -inch vented airspace above the insulation. Other single rafter orjoist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited to 500 square feet of ceiling area for one dwelling unit - 4. Below grade wails shall be insulated either on the exterior to a minimum level of R-10, or on the interior to the same level as wall above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications- See Section 602.2 5. Floors over crawl space or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7- Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. 8. This wall insulation requirement denotes R-19 wall cavity insulation plus R-5 foam sheathing - 9. Doors, including all fire doors, shall be assigned default U -factors from Table 10-6C 10- Where maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U -factor of U =0.40 or less is not included in glazing area limitations. It. Overhead glazing shall have U -factors determined in accordance with NFRC 100 or as specified in Section 502..1.5. 12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. This project will take advantage of the following. exceptions to the prescriptive option: 0 602.6 Exception 1. One door, that is 24 sq ft or less, that does not meet the standards is allowed- Location of door taking this exemption. 0 602.5 Exception 2. Doors with U -factor of 0.40 allowed without calculations, Option IV only. Location of door(s) taking this exemption: Glazin U -Factor Doorg Wall r a Vtatt a Wal! Option GlazingArea10 Vertical Overhead" U- Ceiling' Vaulted Above int ext Floor' Stab on a /o Of Floor Factor Ceiling Grade' Below Below e6 Grade6 Grade Grade I t0% 0.32 4.58 0.2 R-38 R-30 R-15 R-15 R-10 R-30 R-10 II* 15% 0.35 0.58 0.2 R-38 R-30 R-21 R-21 R-10 R-30 R-10 25% Group R-1 III and R-2 0.4 0.58 0-2 R-381 R-301 R-21/ R-15 R-10 R-30/ R-10 Occupancies U=0.031 U-0.034 UA.057 U=0.029 Only Unlimited Group R-3 and fV R-4 0.35 0S8 0.2 R-38 R-30 R-21 R-21 R-10 R-30 R-10 Occupancies Only Unlimited Group R-1 and V R-2 0.35 0.58 0-2 R-38 R-30/ R-21/ R-15 R-10 R-301 R-10 Occupancies /U=0.434 U=0.034 U=0.057 U=0.029 Only Reference Case O. Nominal R -values are for wood frame assemblies only or assemblies built in accordance with Section 60 € -l. I. Minimum requirements for each option listed- For example, ifa. proposed design has a glazing ratio to the conditioned floor area of 13% it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed design which cannot meet the specific requirement of a listed option above may calculate compliance by Chapter 4 or 5 of this Code. 2. Requirements applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3. 'Adv' denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the ceiling and the underside of the roof sheathing is less than 12 inches and (b) there is a minimum 1 -inch vented airspace above the insulation. Other single rafter orjoist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited to 500 square feet of ceiling area for one dwelling unit - 4. Below grade wails shall be insulated either on the exterior to a minimum level of R-10, or on the interior to the same level as wall above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications- See Section 602.2 5. Floors over crawl space or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7- Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. 8. This wall insulation requirement denotes R-19 wall cavity insulation plus R-5 foam sheathing - 9. Doors, including all fire doors, shall be assigned default U -factors from Table 10-6C 10- Where maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U -factor of U =0.40 or less is not included in glazing area limitations. It. Overhead glazing shall have U -factors determined in accordance with NFRC 100 or as specified in Section 502..1.5. 12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. This project will take advantage of the following. exceptions to the prescriptive option: 0 602.6 Exception 1. One door, that is 24 sq ft or less, that does not meet the standards is allowed- Location of door taking this exemption. 0 602.5 Exception 2. Doors with U -factor of 0.40 allowed without calculations, Option IV only. Location of door(s) taking this exemption: JAPOR BARRIERS shall be installed toward the waren surface as represented below (select one): Floors- Kraft Faced Unfaced insulation with Plywood Sheathing batt insulation ❑ polyethylene (4 mil) ❑ (Exposure l or exterior grade) Walls: Face stapledUnfaced insulation with ❑ ❑ batt insulation E]polyethylene (4 rail) Vapor Retarding Paint Ceilings*: Face stapled batt insulation ❑ Unfaced insulation with ❑ Vapor Retarding faint ❑ polyethylene (4 tail ) *NOTE: Vapor Barrier not required where ventilation space averages 1.2" or greater above the insulation SLAB INSULATION shall be R-10 minimum and be located on the: ❑ Exterior ❑Interior SLAB INSULATION EXAMPLES NOT CONSTRUCTION DETAILS Floating Slab with Interior Insulation Silicone Caulk Seal , 4" Concrete Slab Is Floating Slab with Exterior Insulation III 1 111 i Flashing/Protection Silicone Caulk Seal 4" Concrete Slab Lill 11 Thermal Break _ _ ------- =111l1=11111 11!11=1I111lIIII:___:--���� III11=_ W(Bmilpoly -!III _ =111!1 =VIII --�Q -Illlf III1{ —I E VIII €111111111 ,� <.:<:__. VIII=11111=}1111=11111— 6mil poly lilll ===` =- Iilill=11111: " =:#:::::11111=11111-11111=Illll�fllll IIIIl�11111=--_ f�� I�—TIIi11=Illi=li�T= =1111!=111!! illi 11111=11111=111 4" Gravel base lull=11111= a . <>: —li}{{=full =!1111=11!11- Al IIlf=1113=IIl11=1!111= —1111]=!ilii` ::f IIIii– 1111- 11111 IITf _:_:__:::_ IIIIi=I_-11111= !1111=1 = _- _:�I =11111=111!1=11111- =1Tff >_ a � R-10 Insulation 11111 11111 {1111-11111=— 24"minimum or VIII-- I—'= _VIII= R-10 Insulation tofrostline 1111€=llifl=1111!=[1111= 24"minimum Floating Slab on Grade w/Interior Slab Insulation Revised 7107 Silicone Caulk Seal Thermal Break 4" Concrete Slab 1111=1111= Ilii- 1111= 6mil poly =ilIII�IIIII-=MITI— it (1111 =fj-1Jj Jill]= 11111= R-10 Insulation =11111=11111—_full=1111€ 24" minimum 11H1=11111 1[111=11111— dill -11111=1111=11111 11—full=![III=111114 lull =11(11=1]111=_ #Ill=1111!= Below Grade Wall with Interior Insulation Damp Proofing TI1=111! 11111-11111-111!1-- 11llti1lli=11111 ITll�lili=111E1�Iill! 11111=111!1=111!1= IIIl1�1111=p1i�r. 11111--flail—Illll— IIT!=11€11= �i11=1Tf{1 Silicone Caulk Seat 4" Concrete Slab 6 mil poly Thermal Break VENTILATION WORKSHEET SOURCE SPECIFIC VENTILATION: Exhaust fans are required in each kitchen, bathroom, laundry room, indoor swimming pool, spa, and other room(s) where excess water vapor or cooking odor is produced. Complete the following table: ocation Required.CFM Actual,CFM KITCHEN FAN 100 CFM BATHROOM #1 FAN 50 CFM BATHROOM #2 FAIN 50 CFM BATHROOM #3 FAN 50 CFM LAUNDRY FAN 50 CFM WHOLE HOUSE VENTILATION: Each dwelling unit shall be equipped with a whole house ventilation system supplying outdoor air to all habitable rooms and exhausting stale air out via a designated fan. Complete the following questions and table: ❑ Not applicable for additions less than 500 sq.ft. SELECT TYPE OF WHOLE HOUSE VENTILATION SYSTEM TO BE USED: ❑ Exhaust fans stem with ducted forced air heating system (VIAQ 303.4.1): • Exhaust fan sized per table below with 24 hour timer. • Forced air heating system ducted to all habitable rooms. • Interior doors undercut %Z" minimum above floor covering. ❑ Exhaust fans stem with fresh air inlets (VIAQ 303.4.1): • Exhaust fan sized per table below with 24 hour timer. • Manual through -wall port or approved window vent. ❑ Inte rated with forced air furnace S stem (VIAQ 303.4.2): • Outdoor air inlet duct sized per table 3-5 connected to the return air plenum of the forced air system. • Volume damper. ❑ Supply fan system (VIAQ 303.4.3): • Distribute air through the forced -air system ducts or through dedicated ducts to each habitable space with 24 hour timer. • Outdoor air must be filtered • Outdoor air inlet connected to supply or return. • Back draft and volume dampers. ❑ Heat recovery system (VIAQ 303.4.4) Revised 7/07 A WHOLE HOUSE EXHAUST FAN MUST BE PROVIDED FOR EACH DWELLING UNIT. Floor Area Bedrooms* (square feet) 2 or less 3 4 S 6 Min. Max. Min. Max. Min. Max. Min. Max. Min- Max. <500 50 75 65 98 80 120 95 143 li0 165 501-1000 55 83 70 105 85 128 100 150 L15 173 1001-1500 60 90 75 113 90 135 105 158 120 180 1501-2000 65 98 80 120 95 143 110 165 125 188 2001-2500 70 105 85 128 100 150 115 173 130 195 2501-3000 75 113 90 135 105 158 120 180 135 203 3001-3500 80 120 95 143 110 165 125 188 140 210 35014000 85 128 100 150 115 173 130 195 143 218 4001-5000 95 143 110 165 125 188 140 210 155 233 'tor more than 0 bedrooms and/or over 5000 square Leet see 'Cable 3-2 Washington State 'Ventilation and ludoor Air Quality Code. Total Floor area: Bedrooms: Whole House Fan Size: Location. ✓ WHOLE HOUSE EXHAUST FAN WILL OPERATE INTERMITTENTLY? Yes ❑ No ❑ Both automatic and manual control needed. Automatic control timer shall be set to operate whole house Cali for a minimum of eight hours per day. ✓ WHOLE HOUSE EXHAUST FAN ALSO SERVES AS A BATH OR LAUNDRY FAN? Yes ❑ No ❑ The capacity shall be the larger CFM requirement. ✓ WHOLE HOUSE EXHAUST FAN WILL OPERATE CONTINUOUSLY? Yes ❑ No ❑ Note: Installers shall provide the manufacturer's installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole House tither control that reads "Whole House ventilation (see operating instructions). " Revised 7/07 V`efl ti (,/ tion si�S tC111 OI)ei-atiii,�,Y .list -i -tic bilis Whole House Ventilation Systems integrated with a Forced Air Heating System' Your new home has been constructed to use energy efficiently, while maintaining a healthy indoor environment with good supply of fresh air. To help you achieve these benefits, we recommend that you take a few minutes to read these instructions. Your home has been constructed to the most current requirements of the Washington State Energy Code (2003 edition) and the Washington State Ventilation and Indoor Air Quality Code (2003 edition). This means your home and the ductwork of your heating system have been well sealed, which limits uncontrolled exchange of air between the indoors and outdoors. The amount of fresh air provided to your home is under your control. You can increase the ventilation rate of your home by opening windows, or by operating your mechanical ventilation systems. Your home has two types of mechanical ventilation: spot ventilation fans, and a whole house ventilation system integrated with your heating system. Fans: A spot fan has been installed in each bathroom, the utility room and the kitchen. If your home includes ars indoor spa, or any other room that may need additional ventilation, a spot fan will be included there as well. The purpose of spot ventilation is to control excess moisture, odors, or chemical byproducts at the source it is far more effective to quickly eliminate moisture and pollutants when they are created than to allow them to dissipate slowly over time. Controlling moisture reduces the cause.of many molds and protects the finishes of your horse. Controlling odors and chemical byproducts reduces any health hazard that may be associated with It is particularly important to operate your kitchen fan if you have a gas or propane range. As well as removing moisture and odors created by cooking, your kitchen exhaust fan removes the unhealthy byproducts of combustion, including carbon monoxide and nitrogen oxides. Recommended spot fan operation: • Turn on the spot fan whenever moisture, odors, household chemicals, or combustion byproducts are present in the room, such as during shower- ing, washing clothes, or cooking. • Since moisture vapor, odors, and combustion byproducts tend to linger, run the spot fan for up to 60 minutes beyond the activity that produced them. Whole house ventilation integrated with the heating system. The forced air heating system in this home is equipped with a ventilation system. This system includes a fresh air intake connected to the return air duct (return air is the air that flows into your heating system), a damper that controls the amount of air that enters the system, and a timer that controls when the system operates. To change the amount of ventilation in your home adjust the timer to increase or decrease the time the system operates. In some cases you may also want to adjust the damper. Here's how the system works: 5UPPLY DUCT FRE5H AICA INTAKE Figure 1, Whole house ventilation system integrated with a forced air heating system. • When the ventilation tuner calls for ventilation, the furnace fan motor turns on. If the ventila- tion system is equipped with a mechanical damper, it also opens. • The furnace fan pulls fresh air through the fresh air intake into the return air duct. • Fresh air is then distributed to the home through the supply air ducts of the heating system. • When the ventilation timer shuts off, the furnace fan motor turns off. If the system has a me- chanical damper, the damper also closes. Note: If your system is not equipped with a mechanical damper, your home will also receive ventilation whenever the system fan operates, including when it's on to provide heating or cooling. Selecting a Whole Ionise Ventilation Schedule: Your contractor has set the timer on your ventilation system to provide a minimum of eight hours of ventilation per day. To get the maximum benefits of the system, you'll want to adjust the timer to suit your own schedule. • Run the system more when you expect to be home, or when more people are expected to be in the home. • Set the timer to cycle the system on and off for short periods. For example, 10 minutes on, 20 minutes off. • Use the manual control to turn the system on when large groups gather in your home. TIME OF DAY ONIOFF PINS AUTO: RUN TIME RASED ON TIMFR ON: CONTINUOUS OPERATION Figure 2. Typical whole house ventilation timer. 2 Ventilation System Operating Instructions Dampers: There are three types of dampers allowed by the ventilation code. Figure 3 identifies these dampers and describes how they work. This system uses the damper checked below. ❑ Manual Damper ❑ Constant Air Flow Regulator ❑ Motorized Damper As required by code', your heating contractor has tested the flow reate of fresh air brought into your home and set the damper accordingly. Manual Damper Operation: In normal operating conditions, the damper is always open, regardless of the settings on the ventilation timer. The home receives ventilation whenever air handler fan turns on, or when the thermostat calls for heating or cooling. Using the timer to regulate the ventilation rate is always the best choice_ But because this system provides ventilation to the home whenever the air handier fan operates, ventilation rates may be excessive during very cold or very hot weather. This can mean wasted energy and an uncomfortable home. In this case, you may wish to adjust the manual damper. Before doing so, keep a few things in mind: • Before you change the damper setting, make note of the position of the damper adjustment_ You will need to return the damper to this setting when the extreme weather passes. • Only reduce the ventilation rate when abso- lutely necessary. • Be aware for signs of under -ventilation, includ- ing smells and high humidity. MANUAl- DAMFER A.Ir Yt r.u.-Ar 70j" 5TIMEN TFIXED: XN511,1,; AIKI'l- Nf REGULA--)K F GULATE5AiRYru� LUw OA5EDON; ?,EPJR r, �C, AIR FIKE 51 ZEAL:WkYSOrER. M()TO'I.ZE ✓ AMPcf ::� NIOTOKOPENJ '?' aE ','..IvTIL I;C ISrALLUI FOR DYTHE 1-M K ?LUPE 15 -E0Uii,TEV EYC1PEti DAF.d:' IZ FOS! TION €i5T'JEr r Figure 3. Selection of dampers used to meet the VIAQ code. Ventilation System Operating Instructions 3