Loading...
20080627110709.pdfov ED Fst. 1890 DATE: June 27, 2008 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Michael D. Echelbarger mike@cchelbarger.com FROM: Jeannine Grawv RE: Plan Check 4 2008-0408 Project: Echelbarger SFR Project Address: 620 Sunset Avenue North During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised plans/documents (affected sheets only) with a written response to each of the item indicating the change made and where it can be found on the plans. Submit directly to the Permit Coordinator assigned to your project. Plans should be hi -lighted or bubbled showing the changes. 1) Please add the following information to the site plan. • Indicate size of rear yard metal shed • Indicate setback distances from metal shed to property lines You may redline plans or resubmit three (3) new site plans scaled no smaller than 1"=20' and one on paper no larger than 8 %Z" x 14". 2) Add note that island sink will be vented through the roof or with a loop vent as permitted by UPC 909.0. 3) Provide specifications on elevator; must include structural footing requirements, elevator pit drainage requirements, venting requirements. 4) Add elevator penthouse on elevation views. Indicate maximum height and width of elevator above actual roof elevation. 5) See attached structural comments from city consultant. Respond to each item in writing. Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison 121 5" Ave N Edmond, WA 98020 Re: Echelbarger Residence 620 Sunset Ave Edmonds, WA 9802 Plan Review #2008-0408 EECE #: EDM 08-52 Plan review number 01 tructur°e Area &F. Main Floor 1972 gpper Floor 3147 Total 5119 Garage 1278 Total 6397 Decks 274 Grand ':l'Otal 667:1. The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, Ordinances, V&IAQC, Energy requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 5 Plan Review Number 01 EECE#: EDM 08-52 Echelbarger Residence 2008-0408 ORDINANCE COMMENTS General 1. Please note on the drawings that the smoke alarms shall be hot-wired with battery back up. R313.2 Sheet 2 Building Section A -A 2. Please add to the drawing the required thread width of the stairs. The rise is specified but not the run. R311.5.3.2 3. Please clarify how the roof will meet the required roof ventilations when the soffit is provided with hardy board. Please modify the drawings accordingly to show how this will be vented. R806 Sheet 3 Foundation & Main Floor Framing 4. Please specify that all the penetrations through the garage to house separation wall shall be protected by filling the opening around the penetrating item with approved material to resist the free passage of flame and products of combustion. R309.1.2 Sheet 4 Main Floor Plan 5. Please specify the required light activation at the top and bottom of the stairs, per R303.6.1. 6. All exterior doors shall have a minimum landing specified on the drawings including the height of the threshold. Please specify the landing out side the storage room door and the back hall door. R311.4.3 7. AOR please specify the required dimension of the intermediated landing on the drawings. R311.5.4 8. Please provide a handrail detail. R311.5.6.2. 9. AOR please specify the hot water tanks shall be strapped to resist lateral displacement as required per M1307.2. 10. Please clarify on the drawing how the dryer will be vented to the outside. The vent shall not be with 3 feet of any opening in the wall. Please add this information to the drawings. M1502.2 Page 3 of 5 Plan Review Number 01 EECE#: EDM 08-52 Echelbarger Residence 2008.0408 11. Please specify that all the penetrations through the garage to house separation wall shall be protected by filling the opening around the penetrating item with approved material to resist the free passage of flame and products of combustion. R309.1.2 Sheet 6 Upper Floor Plan 12. Note minimum required finish wall material & height in the shower & bath areas. R307.2. 13. Please note the windows at the bathtub shall be safety glazed. Please add this on the drawings. R308.4 14. Please �e detail for the construction of the deck. N Ti . ng P1 Pam Brow.-er arr�� c�J' . 15. Please show how the fireplace chimney will be vented to the outside. This must not be near any openings and if it vents through the roof is shall extend a minimum of 2 feet above any combustible material. Since this information is not shown, I was unable to review for this. Table R1003.1 Sheet 7 Roof Framing 16. AOR please specify the locations of the roof drains and their required size. R 903.4 STRUCTURAL COMMENTS General 17. AOR, please note on the drawing that the bottom chord for the truss shall be design for a live load of 20 psf. IBC table 1607.1 R301.5 Sheet 3 Foundation & Main Floor Framing 18. All post to foundations connections shall be specified on the drawings to prevent lateral displacement. Please add this information to the drawings. R407.1 Sheet 4 Main Floor Plan 19. Please note the required width for the shear wall at the patio door. It is required to have a minimum width of 24 "for 2 story. It appears the minimum width will not be met. Please add this to the drawings and modify accordingly. IBC figure 2308.9.3.1 Page 4 of 5 Plan Review Number 01 EECE#. EDM 08-52 Echelbarger Residence 2008-0408 20. The lateral restraint panels at the garage appear should not be less then 24" Please justify the smaller width. lBC 2308.9.3.1 Sheet 5 Framing Abr. Main Floor 21. Please specify the required post to beam comlections at the 6X6 supporting the 5- 1/4X14 PSL. 22. Please add to the drawings the required post to beam connections. I was unable to find where on the drawings this information was specified. Please add this information to support the required design loads. 23. EOR please specify the required collector element to transfer the lateral force into the interior shear walls. Nothing is specified at this time. 24. Please specify the required beam hanger to use for when the beams are flush with each other. For example the 5-1/4 X18 and the 5-1/4X18. I was unable to determine this from the drawings. Sheet 7 Roof Framing 25. Please specify the required anchorage of the truss to the supporting structures. The IBC/IRC required the register design professional to specify this. IBC 2303.4.1.6 R802.10.5 VENTILATION AND INDOOR AIR QUALITY CONTROL COMMENTS Sheet 6 Upper Floor Plan 26. Please modify the whole house fan size to match table 3-2 of the state ventilations code. Based off the number of bedroom and the floor area 100 CFM to 130 CFM appear not to meet the minimum. Please modify accordingly. WSV&IAQC table 3- 2 and 302.3.2 ENERGY COMMENTS General 27. Please note on the drawing the minimum U value for the windows. The max U shall not exceed .35 for the vertical glazing. WSEC code table 6-1 Sheet 3 Foundation & Main Floor Framing Page 5 of 5 Plan Review Number 01 EECE#: EDM 08-52 Echelbarger Residence 2008-0408 28. Please note on the drawing that the vapor barrier shall lap a minimum of 12" WSEC 502.1.6.7 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President