Loading...
2008-0635 Anderson office #2.pdf Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison th 121 5 Ave N Edmonds, WA 98020 Re: Anderson Office 675 Edmonds Way Edmonds, WA 98020 2 Plan Review # 2008-0635 EECE # EDM 08-79 () Plan review number 02 Second Comment Letter Structure/OccupancyType Of OLF Area S.F. Constructions First Floor/S2 VB 200 Gross 1014 First Floor/B VB 100 Gross 2808 Second floor/B VB 100 Gross 3227 Total 7049 Sprinkled Yes Air Conditions Yes The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back-check time. SCOPE OF REVIEW Structural, Ordinance, V&IAQC, Energy The scope of this review is for therequirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 3 Plan Review Number 02 EECE#: EDM 08-79 Anderson Office 2008-0635 Ordinance Comments General 1.Architect of record (AOR), the drawings specify doors with a mark without any code information... There is a new sheet A9.3, but the information for the door marks are not specified on this sheet. Also all the door numbers have been renumbered. Please submit the door information, which I need in order to complete the review. Sheet A0 Cover Sheet 2.For some reason, the code information sheets were modified to the IBC 2003, which is not the adopted code. Please modify accordingly. Sheet A3.1 Bldg. Elevations, Bldg. Sections 3. 14. AOR, please provide detail for the attachment of the brick veneer on the drawings. IBC 1405. The response states the brick veneer is being attached in compliance with NER 602 ICC Evaluations Report. NER 602 is a legacy report under the IBC 2000. The drawing should reflect the requirements for the construction of the brick veneer, not just comply with NER 602. Sheet A5.1 Stair Plans, Stair Sections 4.18. Usable space under the stair shall be a one hour rated assembly. All that is noted is 2 layer of 5/8 gypsum without specifying the required attachment. Please complete the assembly for the useable space under the stairs. IBC 1009.5.3 Enclosures under stairways. The response and drawing state file WP 3510 on sheet A0.1. But sheet A0.1 does not have 3510. Please modify accordingly to have this rated assembly on the drawings. STRUCTURAL COMMENTS Sheet S2.1 Foundation Plan and Second Floor Framing Plan 5.27. EOR, please provide details and analysis for the support of the beam mark B4 at the masonry wall. The response and revised drawings state detail 7/S6. This detail in the notes under 1 reference detail X/X. Please clarify where detail X/X is located on the drawings in order to complete the review. Sheet S6.2 Details Page 3 of 3 Plan Review Number 02 EECE#: EDM 08-79 Anderson Office 2008-0635 6.Detail 8: EOR, please clarify where on the plan this detail is used in order to verify the anchor boltsÂ’ diameter and spacing. ENERGY COMMENTS No comment at this time. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President