20080703083444.pdfPage I of 1 Harrison, Marie From: Eric Lim [elim@aesgeo_com] Sent: Thursday, May 15, 2008 10:01 AM To: Harrison, Marie Cc: Kyle Ray & Kevin Copp; Kristin Hanson Subject: Ray Residence BLD20070518 Marie, am emailing you to respond to this request you sent to Kristin Hanson regarding the Ray Residence: "I am going through the old Ray file and I noticed we are still waiting for a compaction report from the Geotechnical Engineer of Record for the underground storage tank removal. Please provide that inspection report so we can close out that file, W20070518." During the initial demolition, the contractor informed us that this area would be filled in when they constructed the new deck footings. However, the project turned to full demolition and the area appears to have been either backfilled during the full demo or the area was sloped back since it was immediately behind the basement wall fill. The site is currently winterized for erosion control pending new construction. Since we will be observing site work for the new house, we can perform density tests once grading commences and the UST area can be identified and recompacted_ Please note that this area may be graded down as shown on the grading plan_ We hope that addressing this issue during the new construction phase will be acceptable to you, and will not impact the current permit issuance. Based on the small size of the excavation, and our observations of the site stability during erosion control inspection visits, we do not feel that this is an issue that requires immediate attention. Please feel free to call if you have any questions_ Thanks, Eric Lim, PE >2; .32'-..... ;fir.., s:i , a:-42' gas. elim _ aesgeo.wm ,,? `.�. cv v 5/15/2008 � N . (BASISGr 847ARING) F _ 75Tmi PLACE res ..n .. 9•5 00' jZE 2�� � �—�• A"' .tea o . lz�g Q3 L— 25'6SBL yxti �" o 25 BSBL—� OO lsi`O