Re: Garlic Jims Tenant Improvement
9796 Edmonds Way
Edmonds, WA 98020
Plan Review # 2008-0548
Plan review number 01
REcSIVED
J :J' 2000
SUi DING CREPT
EECE # EDM 08-67
Occupancy
Construction Type
Area
B
11-B
1215
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes. The following comments,
deficiencies/corrections must be addressed prior to completion of plans review and
subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for the Structural, Ordinance, V&IAQC, Energy requirements
of this project.
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
ORDINANCE COMMENTS
General
1. Please clarify the parking spaces for this structure. The drawings do not reflect the
required parking spaces that will be provided. Please modify accordingly. IBC
1106
SKo tis -Cay VWS cT l-- 91soLl CV WW1 CIV
corm, rote
Page 2 of 2
Plan Review Number 01
EECE#: EDM 08-67
Garlic Jims
2008-0548
Sheet A0.1 Cover Sheet
STRUCTURAL COMMENTS
Sheet A2.3 Details
3. Detail 10: Please specify the requirement for the lateral bracing of the interior
partitions. All that is noted as required. What is the spacing of the bracing? Please
specify this on the drawings.
4. Detail 9: Please specify the required metal screws to support the diagonal bracing
in order to check capacity. All that is notes is 2x blocking w/ Screws. More
information is required to be specified to complete the review of this connection.
VENTILATION AND INDOOR AIR QUALITY
Mechanical portion listedas' a deferred submittal.
ENERGY COMMENTS
No comments for this portion of the review at this time.
Additional corrections may be required following receipt of corrections and additional
information as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes, clarifications
or additional corrections may be required subsequent to the Building Department plan
review when comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874-
4562 between 8:00 a.m. and 5:00 p.m.