20080731082349.pdfCity of Edmonds
w_m Plan Review Corrections
Pian Check #: 20080524 Date: July 31, 2008
Project Name/Address: BNSF @ 220 West Dayton St.
Contact Person/Address/Fax: Kevin @ 509-547-5919
Permit Coordinator: Marie Harrison 425.771.0220 x 1389 Department: Building
The following City of Edmonds departments have reviewed your application:
Building Department
[ ] Planning Department
[ ] Engineering Department
[ ] Fire Department
[ ] Recycling
[ ] Pretreatment
[ ] Water Quality
Attached are comments and corrections from the appropriate departments. Please respond to
all comments and corrections and resubmit your corrections to all departments
at one time. Please bubble your corrections and submit three sets of
corrected sheets. No partial resubmittals will be accepted.
Thank you,
Senior Permit Coordinator
425.771.0220 x'1389
harrison(ZD_ci.edmond_s.wa.us
DAT&FAx & 7 (Attach fax transmittal
L/Temp/DSTIForms/plan-review9l01
Page —/—of
Eagle Eye Consulting Engineers, P.S.
PO Box 523
Olalla, WA 98359
hoytjeter@centurytel.net
360 874 0562 _
Fax 360 874 0591
To: Marie Harrison
121 5t" Ave N
Edmonds, WA 98020
Re: BNSF
220 West Dayton
Edmonds, WA 98020
Plan Review # 2008-0524 EECE # EDM 08-63
Plan review number 0
i
Replacement office
Structure Occupancy Construction
I'Ype
Area S.F.
Main Floor B VB
1463
Grand total
1463
Lube Shed
Structure Occupancy
`onstruction Area S.F.
-1.'ype
Main Floor SI
VB 64
Grand total
64
The above referenced project is in the process of plan review for compliance with
Edmonds ordinances and applicable codes. The following comments,
deficiencies/corrections must be addressed prior to completion of plans review and
subsequent issuance of permits.
Provide revised plans and calculations along with a written response to each of the items
listed below to facilitate a shorter back -check time.
SCOPE OF REVIEW
The scope of this review is for the Structural, Ordinance, V&IAQC, Energy requirements
of this project.
Page 2 of 3
Plan Review Number 01
EECE#: EDM 08-63
BNSF
2008-0524
All features were checked only to the extent allowed by the submittals provided. All
portions of this project are assumed to meet or will meet other departmental requirements,
conditions and concerns before permit approval.
ORDINANCE COMMENTS
General
Please specify on the drawings the location of the property lines in order to check
the required opening and rating assemblies required. This was not specified on the
drawings.
Sheet A 10 1 Floor Plan
2. Architect of Record (AOR), please update the notes to reference the 2006 IBC and
not the 2003. The 2006 is the adopted code at this time. The drawings have been
prepared to the 2003 IBC and not the 2006 versions. Please update accordingly.
3. Wall type D: Please complete the assembly for the one hour rating. This should
include the attachment of the sheathing, etc. All that is noted is the member sizes
and UL -U419. The required type of taping should be specified in order to complete
the assemblies. Please complete the assembly on the drawings.
4. AOR, please specify the door type 4 on the drawings. This is noted at the closet in
the hallway.
5. Door can not reduced the width of the hallway by more then 1/z during the course
of swing. The door shown appears to reduce this width by more then %z. Please
modify accordingly. IBC 1002.2
STRUCTURAL COMMENTS
Sheet A 10 1 Floor Plan
6. Engineer of Record (EOR), please clarify the required support of the 3-1/8X9 at
the wall mark triangle 3. All beam to post conceptions should be specified on the
drawings. Please modify accordingly.
Sheet A104 Lube Shed
7. South Elevation: Please specify the required dowel into the footing to support the
out of plan design forces. All that is specified is "see sections A/A102." Section
A/A102 does not specify the required dowels into the CMU wall.
7A.5v � i Act-oc ' "+4t-
TSS77 A"P PA4cvt T�
Fsf"
I%M4.
Page 3 of 3
Plan Review Number 01
EECE#: EDM 08-63
BNSF
2008-0524
8. Please specify the required connections of the shed roof on the drawings. Nothing
is specified at this time.
VENTILATION AND IDOOR AIR QUALITY CONTROL COMMENTS
General
9. Please clarify on the drawings how the minimum ventilations rate is being met in
compliance with Washington state ventilations code sections 304 and table 3-4.
Nothing is specified at this time.
ENERGY COMMENTS
General
10. Please note on the drawing which option is being used for the conditions space.
The three options are prescriptive, components or systems. Please clarify upon the
response. WSEC 1310.1
11. The energy form submitted is per the 2004 energy code and not the 2006 that was
adopted July 1 2007. Please resubmit the forms and updated accordingly.
Additional corrections may be required following receipt of corrections and additional
infonnation as requested.
Your plans are being reviewed concurrently with the Building Department, Fire
Department, Zoning Department and Public Works Engineering. Changes, clarifications
or additional corrections may be required subsequent to the Building Department plan
review when comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874-
0562 between 8:00 a.m. and 5:00 p.m.
By:
Hoyt Jeter, P.E.
President
CITY OF EDMONDS
SPECIAL INSPECTION AND TESTING AGREEMENT
The project at ; " ���j]r � issued under building permit
number 2�7$r— �_�_ requires special inspection and/or testing per IBC Chapter 17. The
complete list of special inspections is attached to this document.
BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete
this agreement and the attached structural test(s) and inspections schedule including the required
acknowledgements.
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building
Official prior to performing any duties or inspections. Each special inspector shall submit Statement of
Qualifications to the Building Official for review. Special inspectors shall display identification when
performing special inspections on site. Special inspection and testing shall meet the minimum requirements
of IBC Chapter 17 and the following:
A. Duties and Responsibilities of the Special Inspector
1. Observe Work
The special inspector shall observe the site work for conformance with the approved (stamped) plans
and specifications and applicable workmanship provisions of the IBC. Architect or Engineer
reviewed shop drawings may be used only as an aid to inspection. Special Inspections are to be
performed on a continuous basis—meaning that the special inspector is on site at all times observing
the work requiring special inspection. Periodic inspections, if any, must have prior approval by the
City based on a separate written plan reviewed and approved by the Building Official and the
engineer or architect of record.
2. Report Non -conforming Items
The special inspector shall bring non -conforming items to the immediate attention of the contractor
and note all such items in the daily field report. Any item not resolved in a timely manner shall be
immediate cause of the special inspector to notify the Building Official of the plan deviation, error,
change or omission. It shall also be the duty of the special inspector to promptly notify the engineer
or architect.
3. Complete Daily Reports
Each special inspector shall complete and sign both the special inspection record and the daily report
form for each day's inspection. These records shall remain at the jobsite with the contractor for
review by the City Building Inspector.
4. Furnish Weekly Reports
The special inspector or inspection agency shall furnish the City with weekly reports of tests and
inspections. The project engineer or architect, and others as designated shall also be copied on
reports. Weekly reports must include the following:
• Description of daily inspections and tests made with applicable locations
+ List of all non -conforming items
Report on status of non -conforming items (resolved or unresolved)
• Itemized changes authorized by the Architect, Engineer and City if not included in non-
conformance items.
5. Furnish Final Construction Report
The special inspector or inspection agency shall submit a final signed report to the City stating that
all items requiring special inspection and testing were fulfilled and reported. And, to the best of
f.:1TEMPIBUILDING1SpeciallwpectionAgreementlBC_doc 7104
his/her knowledge the project is in conformance with the approved plans and specifications,
approved change orders and the applicable workmanship provisions of the IBC. Items not in
conformance or unresolved items or any discrepancies in inspection coverage, (Le„ missed
inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically
itemized in this report.
B. Contractor Responsibilities
1. Notify the Special Inspector
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection_ Note, the items listed on the attached schedule and as noted on the approved plans and
specifications are required to have special inspections. Adequate notice shall be provided by the
contractor so that the special inspector has time to become familiar with the project.
2. Provide Access to Approved Plans
The contractor is responsible for providing the special inspector access to approved plans at the
jobsite.
3. Retain Special Inspection Records
The contractor is responsible to retain at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City building inspector upon request.
C. City of Edmonds Building Department Responsibilities
1. Approve special inspectors or inspection agencies
The building department shall approve all special inspectors and special inspection requirements.
2. Monitor special inspection and approve weekly reports
Work requiring special inspection and the performance of special inspectors shall be monitored by
the City Building Inspector. His/Her approval must be obtained prior to placement of concrete or
other similar activities in addition to that of the special inspector.
3. Issue Certificate of Occupancy
The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports
including the final report have been submitted and accepted.
D. Owner Responsibilities
The project owner or the engineer or architect of record acting as the owner's agent shall fund
special inspection services.
E. Engineer or Architect of Record Responsibilities
The engineer or architect of record shall include special inspection requirements on the plans and
specifications.
ACKNOWLEDGEMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner
Special Inspector
General Contractor
City Building Official
L:ITEMPIBUILDING1SpeciailnspectionA,greementIBC_doc 7104
Date
Date
Date
Date
SPECIAL INSPECTION AND TESTING SCHEDULE
PRCIECTNAME 19URDM PERUM NC1, '
. PROJECTADDRESS ._..._ AGENCY SPEC7AitNSPECIM
REINFORCED CONCRETE, GUNITE, GROUT AND MORTAR: STRUCTURAL STEELIWELDING:
Coocreft Gunite GTvut Mosier —SarapleandTestflistspt Wic-mesubctsbelow)
Aggrepw Tests Shop Material Identification
Reinforcing Trus __._ Welding Inspection OSbop 0 Field
Mix Designs — Ultrasonic Inspection OSbop ©Field
Reinforcing Placement _ Fligb-strength Bolting
Batch Plant Inspection Inspection 0Slop p Field
hLwect Placine © A325 ©N ©X ❑ F
Cast Samples O A490
Pick-up Samples — Metal Deck Wtlding Inspection
Compression Tests — Reinforcing Steel Welding Inspection i
Mcial Stud Wading Inspection
PRECAST/PRESTRESSED CONCRETE — Concrete Insert Welding Inspection
PD- Yost -'Taus Pre -Tens Cladding
Aggregate Tests FIREPROOFING:
Reinforcing Tests — Placcrrxm Inspection
Tendon Tests — Density Tests
Mix Desi¢ns — Thickness Tests
Reinforcing Placement — Inspect Batching
Insert Placement
Concrete Batching INSULATING CONCRETE:
Concrete PlaccrnenE — Sample and Test
installation Insrgcnion _ Placement Inspection
Cast Samples _ Unit Wcights
Pick-up samples
Compression Tests EEEI FILL MATERIAL:
MASONRY:
Acceptance Tests
_ PlaccJnent Inspection
— Special Inspection Stresses Used
_ Field Density
__._ PJcliminary Acceptance Tests (Masonry Units. Wall Prisms) '
— Subsequent Tests (Mortar: Grout, Field Wall prisms)
STRUCTURAL WOOD:
_.__ Placernew Inspection of units
_ Shear Wall Nailing Inspection
— Inspection of Glu -lam Fab_
— Inspection of Truss Joist Fab.
ADDITIONAL INSTRUCTIONS OR OTHER TES'T'S
— Sample and fest Components
AND INSPECTIONS:
F—compktcd by_ Tick:
Telephone No- Date