Loading...
2008-0750 Murillo Eagle Eye.pdf Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison th 121 5 Ave N Edmonds, WA 98020 Re: Murillo Addition th 23406 97 Place W Edmonds, WA 98020 Plan Review #2008-0750 EECE #EDM 08-85 (2) Plan review number 02 Structure Area S.F. Lower floor 2781 Second floor 1154 Total 3935 Garage 319 Total4254 New Deck 84 Patio 66 Grand total 4404 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back-check time. SCOPE OF REVIEW Structural, Ordinance, V&IAQC, Energy The scope of this review is for therequirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 4 Plan Review Number 02 EECE#: EDM 08-85 Murillo Addition 2008-0750 STRUCTURAL COMMENTS General 1.4. Please specify the required diaphragm nailing on the drawings.. Table IRC 503.2.1.1(1). The response states “See new sheet 5A”. This sheet does not have the diaphragm nailing requirements specified. The table is for vertical loads and not diaphragm requirements. Please modify accordingly. Sheet 3 Purposed (lower) Floor Plan 2.5. Please add a detail at the bedroom 6 and the existing garage above. Based off the drawings the support of the existing garage will be compromised with this remodel. Please clarify on the drawings. The response states to furr out the wall for the new additions, but the slab will not support the forces. Please modify accordingly. 3.Please specify the required header size and the required support at the windows noted on this sheet. Sheet 5 Foundation Plan/Deck Framing 4. 8. Based off a span off trusses of approximately 35 feet the allowable soil bearing pressure will be exceeded. Please submit analysis either to justify the footing size or modify accordingly. The response states made the footing 16” wide X 8” but this will not support the vertical forces due to the door openings. Please modify the drawing accordingly. Sheet 6 Roof Framing Plan 5.10. Please specify the required over framing attachments on the drawings. This has not been specified on the drawings. Please add this to the drawings. 6.12. Please specify the required connection for the 6x10 beams on the drawings. A positive connection is required to be specified. The only place the connection is specified is at the post but not at the main house. How is the new 6x10 going to be supported at these locations? Please modify the drawings to show how the vertical loads are going to be transferred. 7.13. The drawings do not show any information for the attachment of the new diaphragm to the existing wall locations. Please add a detail at this location to show the lateral load path on the drawings. The response states “See detail cross sections on sheet 5A”. The diaphragm is a horizontal or sloped system acting to Page 3 of 4 Plan Review Number 02 EECE#: EDM 08-85 Murillo Addition 2008-0750 transmit lateral forces to the vertical resisting elements. This still is not specified on the drawings. Nothing is specified to transfer the diaphragm lateral forces. ORDINANCE COMMENTS General 1.1. Please add the dimension for the construction of this structure. It is fine to put field verify on the drawings but with the dimension specified there is know way to determine the actual size of the structures. I have scaled some of the missing dimension but this information should be provided when resubmitting. Please specify how far the kitchen area extends past the exiting garage wall. The drawings show a jog out without any dimension specified. 2.4. The drawings note the total area on the site is 3179 ft^2 but based off the written dimensions and a few places scaled this gross area will be exceeded. Please add all pertinent written dimensions and modify the drawings accordingly to not exceed the 3200 ft^2. This still cannot be verified since the jog out is not specified at the kitchen. Sheet 3 New Floor Plan 3.10. Please specify the required fire-resistant filling around all penetrations at walls between the house and the garage. With the new wall being added it is not clear if there will be any penetrations new penetration into the structure. R309.1.2. This still is not noted on the drawings. Please add this to the drawings. 4.11. All exterior doors shall have a minimum landing specified on the drawings including the height of the threshold. R311.4.3 The response states 36” minimum, but this is not noted for the doors off each of the bedrooms to the exterior. Please modify accordingly. Sheet 6 Roof Framing Plan 5.17. Please clarify on the drawing the required roof ventilations. I was unable to determine this from the drawings. R806. The response states “bird block from the truss company”. Please submit this to enable complete review of proper roof ventilations. Sheet 7 Cross Section 6.19. The building code requires roofs built with combustible material and with a vertical height of 30” or more to have an attic access. Please note on the drawing the vertical clearance and note the required attic access if required. (Without Page 4 of 4 Plan Review Number 02 EECE#: EDM 08-85 Murillo Addition 2008-0750 knowing the slope of the truss bottom chord and size there is know way to determine if the 30” will be exceeded. R807.1. The response states that the access is off the enclosed deck. Please provide details at this area to show how this is being built. It is not clear based on the submitted drawings. VENTILATION AND INDOOR AIR QUALITY COMMENTS General 7.20. Please specify the location and the required CFM for the whole house fan for this structure. Since the remodel area exceeds 500 ft the structures shall meet the whole house state ventilation requirements. WSV&IAQC 101.3.1.1. The required CFM shall be specified on the drawing for the structures. The response states “per HVAC contractor.” If this is to be specified as a deferred submittal, this should be listed on the drawings. Nevertheless, the minimum required per the Washington state ventilations codes should be specified on the drawings. Please modify accordingly. ENERGY COMMENTS Prescriptive method used Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874-0562 between 8:00 a.m. and 5:00 p.m. By: Hoyt Jeter, P.E. President