Loading...
20080805140742.pdfEagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytieter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison 1215' Ave N RE'I VED Edmonds, WA 98020 Re: BNSF J U L 3 1 2908 220 West Dayton SUILDIN.G DEPT. Edmonds, WA 98020 Plan Review # 2008-0580 EECE # EDM 08-69 Plan preview number 01 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Mechanical requirements of this project. All. features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 2 Plan Review Number 01 EECE#: EDM 08-69 BNSF 2008-0580 AMCHANICAL COMMENTS General 1. Please note the required caulking at all penetrations. This is important to prevent return air from area not allowed. 2. Please clarify the location of the return area. if rasing the attic then all electrical and phone cables are required to be rated. IMC 602.1 Sheet MOOI Notes -and Abbreviations No comment for this sheet at this time. Sheet M101 Plumbing Plan 3. Please modify the seismic strap to show the strapping shall be a third points not in the middle as per the details. Sheet M201 HVAC Plan 4. Return air is not allowed in kitchen. Please clarify that the break room will not be a kitchen. A note is fine to be placed on the drawings. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. an Hoyt Jeter, P.E. President