Loading...
20080806074733.pdfEagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel. net 360 874 0562 Fax 360 874 0591 To: Marie Harrison 1215" Ave N Edmonds, WA 98020 Re: Lift Station 7 & 8 209 West Dayton Edmonds, WA 98020 "ms's AUG - �5 plpr, I BUILDING DEpT, Plan Review # 2008-0545 EECE # EDM 08-64 (2) Plan review number 02 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural and Ordinance requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Please note the sheet pile shorinz was not submitted upon this response. Page 2 of 5 Plan Review Number 02 EECE#: EDM 08-64 (2) Lift Station 7 & 8 2008-0545 ORDINANCE COMMENTS General 1. The site plans does not show the distance from the plot lines. Please add this to the drawings. IBC 106.2 This appears not to be addressed at this time. 2. 2. Please list clearly all deferred submittal on the drawings. IBC 106.3.4.2 This appears not to be addressed at this time STRUCTURAL COMMENTS General 3. S. Please provide a key of the analysis to show which pile design is far which pile. It is not clear based off the information submitted at this time. The response state this is not the responsibility of the HDR but the contactor. Please submit the required information from the contractor in order to complete the review. 4. 6. The shoring wall used a program prepared by eiviltech. Please submit the manual or portion of the manual specific for this project for review. Without this information there is no way to tell if the program is design to the most current adopted code. The references specified are not in the IBC reference standards. The response state this is not the responsibility of the HDR but the contactor. Please submit the required information from the contractor in order to complete the review 5. 9. Please add to the drawing the required inspections for the pile foundations. IBC table 1704.8 The response states this is not the responsibility of the HDR but the contactor. Please submit the required information from the contractor in order to complete the review Sheetl of 4 Sheet Pile Shoring 6. 11. The drawings have three sections A -A noted. It is not clear which sections shall be used where since they have the same call out. Please modify in order to complete the review. The response state this is not the responsibility of the HDR but the contactor. Please submit the required information from the contractor in order to complete the review Page 3 of 5 Pian Review Number 02 EECE#: EDM 08-64 (2) Lift Station 7 & 8 2008-0545 7. 12. Please submit area and the moment of inertia structural information for the CZ114 or PZ323 sheet pile material and sections. This should be added to the drawings. This was not in the submitted information. The response state this is not the responsibility of the HDR but the contactor. Please submit the required information from the contractor in order to complete the review Sheet2 of 4 Sheet Pile Shoring 8. 13. Please submit area and the moment of inertia structural information for the LZ3 or SZ12 sheet pile material and sections. This should be added to the drawings. This was not in the submitted information. The response state this is not the responsibility of the HDR but the contactor. Please submit the required information from the contractor in order to complete the review 9. 14. Please submit area and the moment of inertia structural information for the PZ7 or SZ375 sheet pile material and sections. This should be added to the drawings. This was not in the submitted information. The response state this is not the responsibility of the HDR but the contactor. Please submit the required information from the contractor in order to complete the review Sheet3 of 4 Sheet Pile Shoring 10. 15. Please submit area and the moment of inertia structural information for the PZ22 or XZ85 sheet pile material and sections. This should be added to the drawings. This was not in the submitted information. The response state this is not the responsibility of the HDR but the contactor. Please submit the required information from the contractor in order to complete the review Sheet4 of 4 Sheet Pile Shoring This sheet was not submitted upon the response. General LS7 11. 16. Please add the seismic qualifications requirements for the mechanical and electrical per IBC 1708.5 to the drawings. This has not been addressed at this time. 12. 17. Please add to the drawing the required earthquake design date per IBC 1603.1.5 This has not been addressed at this time. Page 4 of 5 Plan Review Number 02 EECE#: EDM 08-64 (2) Lift Station 7 & 8 2008-0545 Sheet 57-4 LS7 Structural Sections 1 13. 18. Engineer of Record (EOR), please specify the required placed location of the reinforcement steel. The response state the reinforcement has been located but the drawings do not specify where the steel shall be placed. For example, what is the clearance of the vertical steel from the face of concrete? Where does the first tie occur? None of this information is specified on the details. Please clarify where this information is specified. 14. 19. EOR, please submit analysis for the elevated concrete stairs. Analysis has not been submitted for the elevated stair. Please submit this upon the response. Sheet 57-5 LS7 Structural Sections 2 15. 20. EOR, please specify the required placed location of the reinforcement steel. The response state the reinforcement has been located but the drawings do not specify where the steel shall be placed. For example, what is the clearance of the vertical steel from the face of concrete? Where does the first tie occur? None of this information is specified on the details. Please clarify where this information is specified Sheet 57-6 LS7 Structural Details 1 16. 21. Detail 6: EOR, please specify the required adhesive anchor system to be used shown in this detail. This appears not to be specified on the drawings. The response state this is in the specs. Please submit this in order to complete the review or add to the drawings what is required. Sheet 58-2 LS8 Structural Plan 17. 23. EOR, please specify the required expansion bolt that is going to be used for the connections. The response state this is in the specs. Please submit this in order to complete the review or add to the drawings what is required Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. Page 5 of 5 Plan Review Number 02 EECE#: EDM 08-64 (2) Lift Station 7 & 8 2008-0545 By: Hoyt Jeter, P.E. President