Loading...
20080811152935.pdfEagle Eye Consulting Engineers, P.S. PO Box 523 01alla, WA 98359 hoytjeter@centurytel.net 3608740562 Fax 360 874 0691 To: Linda Thomquist 121 5h Ave N Edmonds, WA 98020 Re: Klug Remodel 724 9th Ave N Edmonds, WA 98020 Plan Review # 2008-0603 EECE # EDM 08-75 Plan review number 01 structure A i - e -a �'S. Existing Main Floor 1600 Added Main floor 36 Ppper floor 582 Total 2218 Exiting Garage 360 Total 2578 Peck 48 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/coffections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, Ordinance, V&L4QC, Energy requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. u U I)EVELoPMENT SEBVICES GTR. CITY OF EDMONDS Page 2 of 4 Plan Review Number 01 EECE#: EDM 08-75 Klug Remodel 2008-0603 ORDINANCE COMMENTS Sheet 2 Upper Floor Plan 1. Please specify the required light activation at the top of the stairs, per R303.6. I. 2. Please note the window at the stair landing shall be safety glazed or justify on the drawings not required. R308.4 3. The window at the bathtub shall be safety glazed. Please note this on the drawing. R308.4 4. Please clarify how the 560 square feet was determined for the additions. Based off the written dimension the area is 583. Please clarify how the 560 was determined and modify accordingly. 5. Please provide guard details at the stairway. Nothing is provided at this time just note V2 walls. R312 6. Please provide flashing details at the balcony to prevent water penetrating the building. R703.8 7. Please provide guard details for the balcony rail. Nothing is provided at this time. R312 Sheet Wain Floor Plan 8. It appears there is a door at the existing laundry room since BM7 is being added. Please specify the required separations of the residence and the garage. R309.1 9. Please note on the drawings any penetration from the garage and the residence shall be protected by filling around the open to prevent the passage of flame and products of combustions. R309.2 10. Please specify the required light activation at the bottom of the stairs, per R303.6. 1. Sheet 5 Stair Detail, Balcony detail, Cross Section 11. Please clarify on the drawing how the enclosed space will be vented at the landing shown at the stairs. It appear this space will be complete concealed. 12. Please specify the required flashing not just a note flash. More information is required to show code compliance to prevent water from entering the structure. R703.8. Page 3 of 4 Plan Review Number 01 EECE#: EDM 08-75 Klug Remodel 2008-0603 STRUCTURAL COMMENTS Sheet 3Main Floor Plan 13. The drawings is using (4) 2x 12 to support the joist. But the member are being hung from the beam. Unless the 2X 12 are attached to transfer the force to work compositely only one joist will be supporting the forces. This joist will not support the design loads. Please modify the drawings in order for the design forces to supported. Sheet 4 Lower Floor/Foundation Plan 14. Please specify the required depth of the footing supporting the bearing wall. The width of 12" is specified but not the required depth. 15. EOR, please provide a detail how the existing wall and new portion of the wall note at the garage entrance will be constructed. Is the existing ply being complete removed so the wall will act as design or is another method used? Please clarify on the drawings how this will be built in order to resist eh lateral forces. Sheet 5 Stair Detail, Balcony detail, Cross Section 16. Please specify the required connection of the balcony joist to the supporting beam. 17. Please specify the required connection of the stair stringer to support the desing loads. Nothing is specified at this time. Sheet 6 Shear wall Schedule 18. Please modify note 7 for shear wall mark 2 to state 3X member required and the nails shall be staggered. IBC table 2306.4.1 footnote e VERNTILATION AND INDOOR AIR QUALITY CONTROL COMMENTS No comment at this time for this portion of the review ENERGY COMMIENTS Prescriptive Method Used No comment at this time for this portion of the review Additional corrections may be required following receipt of corrections and additional infbrmation as requested. Page 4 of 4 Plan Review Number 01 EECE#: EDM 08-75 Klug Remodel 2008-0603 Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By: "�/' Hoyt Jeter, P.E. President