Loading...
20080811155810.pdfEagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoAeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Linda Thornquist 1215"' Ave N Tacoma, WA 98020 Re: Vanleynseele Remodel 20416 80th Ave w Edmonds, WA 98020 Plan Review # 2008-0586 EECE # EDM 08-72 Plan review number 01 Structure Stated Area S.F. Existing lower floor 1114 Existing Main Floor 1502 Added to main floor 146 Total 2766 Existing Garage 400 Total 3166 Existing Deck 134 New Deck 89 Grand total 3389 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, Ordinance, V&IAQC, Energy requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 4 Plan Review Number 01 EECE#: EDM 08-72 Vanleynseele Remodel 2008-0586 ORDINANCE COMMENTS General 1. The sum moon design is not register with the state of Washington to offer neither architectural service nor engineering service. Please submit information from the state of Washington board of engineers or architects license to offer professional services with -in this state. Please submit this upon response. Sheet A5.0 Main Floor Plan 2. AOR, please add the information for the handrails for the exterior stairs at the covered entry. R311.5 3. AOR, please clearly add to the drawing the required riser and tread depth for the exterior stairs. R311.5.3 4. The drawings do not show any access into the bedroom room off the new bathroom. Please clarify. STRUCTURAL COMMENTS General 5. Since the lateral system does not fall under conventional construction per IRC lateral analysis is required for this additions. Knee braces in the deck are transferring the lateral forces. The R -value for this is not 6.5. Please submit this with a licensed profession stamp and signature from the State of Washington. Sheet A4.0 Main Floor Framing Plan 6. Detail 1: Please specify the required connection of the new solid blocking to the structures. 7. The drawings state to use U210 for the pressure treated joist. U210 are not manufacture with the proper treatment to be used in contact with treated lumber. Pleas modify accordingly. R319.3 Sheet A6.0 Roof Framing Plan 8. Please specify the required connection of the new 4x10 to the supporting studs. 9. Please specify the required connection of the 2x12 rafter to the supporting beam. Page 3 of 4 Plan Review Number 01 EECE#: EDM 08-72 Vanleynseele Remodel 2008-0586 Sheet A8.0 Sections 10. Please add details 2 on sheet A5.0 as noted on the sheet in the partial sections. This detail was not on this sheet. ( I assumed the details should state 2 on A8.0 and not A5.9) Sheet S 1.0 Structural Notes 11. The anchor bolt washer shall be a minimum of 3X3X.229 but the drawings state 2x2x3/6. Please modify accordingly. IBC 2305.3.11 & R602.11.1 Sheet S2.0 Main Floor Shear wall Plans and Notes 12. Please submit lateral analysis for the lateral forces being resisted. This appears to fall under timber frame cantilever column system and the R -value shall not be greater then 1.5. 13. Please note the floor shall be solid blocked in order to transfer the diaphragm shear forces. A cantilever system is required to have the diaphragm blocked. 14. Please submit analysis and detail for the attachment of the knee braces shown on this sheet. Nothing is specified at this time. 15. Please clarify on the drawing the required beams, post, connections, ECT. Nothing is specified at this time to transfer the design forces VENTILATION AND INDOOR AIR QUALITY CONTROL COMMENTS No comment at this time. ENERGY COMMENTS Sheet A8.0 Sections 16. Please modify the insulating in the wall to be R21 and not R19. WSEC table 6-1 ( Sheet A1.0 has the Washington State energy code requirements but the details does not reflect this) Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Page 4 of 4 Plan Review Number 01 EECE#: EDM 08-72 Vanleynseele Remodel 2008-0586 Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. By:.� Hoyt Jeter, P.E. President