Loading...
20080822125852.pdfEagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359IrA�^ hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison 1215" Ave N Edmonds, WA 98020 Re: Freywald Residence 9503 234`x' St SWuLDI G DEPT. Edmonds, WA 98020 Plan Review # 2008-0572 EECE # EDM 08-68 Plan review number 01 Structure Area S.F. First floor 1759 Second floor 1401 Total 3160 Garage 561 Total 3721 Porches 262 Grand total 3983 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Ordinance, Structural, V&IAQC, and Energy requirements of this project. All features were checked only to the extent, Ordinance, V&IAQC, Energy allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 4 Sheet 3 Main Floor Plan 1. Please provide a detail of the guardrail on the drawings. IRC 312 and Table 301.5 2. Please specify the required stair illumination on the drawings. R303.6 3. Please specify the required light activation at the top and bottom of the stairs, per R303.6.1. 4. Note the minimum required finish wall material & height in the shower & bath areas. R307.2. 5. Please specify that all the penetrations through the garage to house separation wall shall be protected by filling the opening around the penetrating item with approved material to resist the free passage of flame and products of combustion. R309.1.2 6. Usable space under stairways shall have the walls and soffits on the enclosed side protected with a minimum of 1/2 -Gypsum. Please add this to the drawings. R311.2.2 7. All exterior doors shall have a minimum landing specified on the drawings including the height of the threshold. R311.4.3 8. Please provide a handrail detail. R311.5.6.2. 9. Please add a smoke alarm outside of bedroom 4. Smoke alarms shall be installed outside each separate sleeping area in the immediate vicinity of the bedrooms. R313.2 10. Provide attic access size & location over the garage. R807.1. 11. Please specify the hot water tanks shall be strapped to resist lateral displacement as required per M1307.2. 12. Please provide the required calculations and the equipment sizes for the heating and cooling systems. IRC 1403.3 and WSEC section 503 Sheet 4 Upper Floor Plan 13. Note minimum required finish wall material & height in the shower & bath areas. R307.2. Page 3 of 4 Plan Review Number 01 EECE#: EDM 08-68 Freywald Residence 2008-0572 14. Architect of Record (AOR), please add guardrail details on the drawings to show compliance with the code. R312 Sheet 5 Roof Framing Plan 15. Please specify the locations of the roof drains and their required size. R 903.4 STRUCTURAL COMMENTS General 16. Please clarify how the seismic weight of 133.2 kips was determined in the analysis. 17. Please note on the drawing that the bottom chord for the truss shall be design for a live load of 20 psf. IBC table 1607.1 R301.5 18. Please note the plate washer shall be a minimum 3" x 3" x 0.229" at all anchor bolts. R602.11.1. and IBC 2305.3.11 Sheet 5 Roof Framing Plan 19. Please specify the required post and connections for the support of the 5-1/4X11- 7/8 at bedroom 3. 20. Please specify the required connections and support for the 5-1/4X11-7/16 between bedroom 2 and bedroom 3. 21. Please specify the required post to beam connection of the 6X12 to the supporting post at the garage wall. 22. Please clarify what the post and the connection of the beam to post at the corner of the porches. Nothing is specified at this time. 23. Please specify the required post to beam connection of the 6X12 to the supporting post at the rec room. 24. Please provide a detail at the 5-1/4 X 14 flush framing into the (2) 1-3/4X7-114 LVL. The joist 11-718 appear to bear on the top and the 14" deep will not be able to bear on it. If this is to be notched, then analysis and details should be provided to justify. 25. Please specify the required support of the 3-1/2X11-7/8 Flush beam include all connections. Page 4of4 Plan Review Number 01 EECE#: EDM 08-68 Freywald Residence 2008-0572 26. Please specify the required support and connections for the 3-112X14 flush PSL in the roof -framing plan. It is not clear what will be used in order to check the connections. 27. Please clarify the beam size at bedroom #2. It is not clear what the depth will be. It is unreadable. 28. Engineer of Record (EOR), Please specify the required truss anchorage on the drawings and including the spacing of the trusses. R802.10.5 VENTILATION AND INDOOR AIR QUALITY CONTROL COMMENTS No comment for this portion of the review at this time. ENERGY COMMENTS Prescriptive method used No comment for this portion of the review at this time. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. Hoyt Jeter, P.E. President