Loading...
20080829080231.pdfre% W F dem City of Edmonds We Plan Review Corrections Plan Check #: 20080524 Date: August 29, 2008 Project Name/Address: BNSF @ 220 West Dayton Contact Person/Address/Fax: Kevin @ 509-547-5919 Permit Coordinator: Marie Harrison 425.771.0220 x 1389 Department: Building The following City of Edmonds departments have reviewed your application: [ Building Department [ ] Recycling [ ] Planning Department [ ] Pretreatment [ ] Engineering Department [ ] Water Quality [ ] Fire Department Attached are comments and corrections from the appropriate departments. Please respond to all comments and corrections and resubmit your corrections to all departments at one time. Please bubble your corrections and submit three sets of corrected sheets. No partial resubmittals will be accepted. Thank you, r Senior Permit Coordinator 425.771.0220 x 1389 harrison(ab.ci.edmonds.wa.us DATE-FAM� (Attach fax transmittal Page / of Lo� zol 4-1 UTemplDST/Formslplan-review9101 Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison 121 5hAve N Edmonds, WA 98020 220 West Dayton Edmonds, WA 98020 Plan Review # 2008-0524 EECE # EDM 08-63 Plan review number 02 Replacement office tructure occupancy Construction Area SJ Type 4ain Floor B VB 1463 grand total 1463 Lube Shed structure occupancy Construction Area S.I♦ Type Main Floor S1 VB 64 xrand total 64 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The fallowing comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural, Ordinance, V&L4QC, Energy requirements of this project. Ft ' AUG 2 SUR-D3UVO DEET. Page 2 of 3 Plan Review Number 02 EECE#: EDM 08-63 BNSF 2008-0524 All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. 1► 1 E� .a1�JK1?i` I►� I �►Y iF►y General 1. 1. Please sped on the drawings the location of the property lines in order to check the required opening and rating assemblies required. Ais was not specified on the drawings. The response state the existing retaining wall is the location of the properties line/lot lines.. But this is only one side for the building. The code requires all properties/lot lines to be specified on the drawings. IBC 106.1 STRUCTURAL COMMENTS Sheet A 10 1 Floor Plan 2. d. Engineer of Record (EOR), please clarify the required support of the 3-1/8X9 at the wall mark triangle 3. All beam to post conceptions should be specified on the drawings. Please mod6 accordingly. The response state connection is called out on A102 and A101. But all that is specified is ABA44 and ECCQ3-4SDS2.5. The column is s tube steel column as noted on the drawings. TS typically stands for tube steel and this is metal not wood. Please add a detail and clarify how this connection will work to transfer the design loads. Sheet A104 Lube Shed 3. 7. South Elevation: Please specify the required dowel into the footing to support the out of plan design forces. All that is specified is "see sections A/A102. " Section AIA 102 does not specify the required dowels into the CMU wall. This still has not been addressed. How far is the dowel going to be embedded into the stem wall. This should not be left up to the contractor but should be specified on the drawings. Please modify the drawings accordingly. 4. 8. Please sped the required connections of the shed roof on the drawings. Nothing. is specified at this time. The response state see Al 04 but this sheet does not specify how the roof will be attached to the top of the CMU wall. The roof on this wall must acts as a diaphragm to transfer the lateral loads to this wall. The only way this will be accomplished is by a positive connection to the top of the wall. Also the diaphragm connections at the intermediated supports. All that is noted is provide 3 bolt with 2x2xl/4 plate washer at end of studs. This is not sufficient as noted on the drawings. This should be clearly specified and detailed accordingly. In addition, the shed roof diaphragm forces must be transferred and Page 3 of 3 Plan Review Number 02 EECE#: EDM 08-53 BNSF 2008-0524 this also is not specified how this will be accomplished. ASCE 12.14.7.5.1 and ASCE 12.14.7.5.3 Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. Hoyt Jeter, P.E. President