Loading...
2008-0845 bldg 3 MDG Final inpection letter.pdf M ORGAN D 11207 Fremont Ave N ESIGN Seattle, WA 98133 Tel: 206 375-3397 G ROUP Fax: 866 847-6420 LLC www.morgan-design.net April 30, 2009 City of Edmonds Development Services Department thnd 121 5 Avenue North, 2 Floor Edmonds, WA 98020 Woodway Estates Apartments RE: 23000 Edmonds Way - Edmonds, Washington Final Report pursuant to RCW 64.55.030 for Building #3 Cladding replacement only Permit Number: 2008-0845 Applicant: Shibayama Associates, L.L.C., dba Woodway Estates Morgan Design Group LLC was retained to act as independent third-party building envelope consulting firm in accordance with the requirements set forth in RCW 64.55.030 to observe and inspect installation of building enclosure elements during the course of such construction and to provide a letter of compliance. Further, Morgan Design Group LLC was retained to provide building enclosure details and specifications, and, to conduct periodic site visits to ensure that the work carried out conforms to the building enclosure details and specifications. We conducted limited number of site visits to observe the work in progress with respect to the replacement of cladding systems. The purpose of this report is to evaluate, to the extent reasonably ascertainable, the present condition of the cladding system on Building #3, excluding the chimneys as they will be observed and reported separately. Based on our limited examination of the cladding system components, to the extent reasonably ascertainable and in our professional judgment, the present condition of the building enclosure will not adversely affect the performance of the buildings and will protect the buildings or their components from water or moisture intrusion. This letter does not provide a warranty or guaranty on behalf of the contractor nor does it release the contractor from its duty and liability for the work performed on this project. It is the contractor’s A rchitectural D esign ¤ B uilding E nvelope C onsulting responsibility to guaranty the work in accordance with the Washington State Statutes for a period of 6 years. It is the contractor’s responsibility to repair or otherwise compensate the developer and/or property owner for any and all defects encountered during the warranty period as stated above in a timely manner. All such repairs and remediation work must be carried out in workmanlike manner. Sincerely, M D G ORGANESIGNROUP LLC H. John Parsaie, Ph.D., Assoc. AIA Vice President cc: Brian Shibayama, Shibayama Associates, L.L.C. DISCLAIMER: The information, observations, opinions and recommendations in this report are the MORGAN DESIGN GROUP LLC exclusive use of the Client named in this report. assumes no liability or responsibility in the event that any other party uses this report. The opinions and recommendations presented herein are based on limited visual observations at the site. COPYRIGHT NOTICE: MORGAN The information contained in this document is the exclusive property of DESIGN GROUP LLC and are protected under the copyright laws of the United States. M D G 2009 ORGANESIGNROUP LLC 2 MDG Woodway Estates BLDG#3 Compliance Report 04.30.09.doc