Loading...
20080902141820.pdf/ �-� v 2oC-) g, �),_� s 9/� / /,-/ -�- z AnP(-aa c 14 7d - 'y d An equal opportunity employer L JEDOE e� rlrinl�Il �COBoft EIE LLMC01487RIJCTION Visit our website at www.finishingedge.com 2920 State St. ■ Everett, WA 98201 Phone 425-339-8070 ■ Fax 425-339-8073 PROPOSAL 1 CONTRACT AGREEMENT Attn: Steve Danard Date: August 11, 2008 Fax: sdanard@aol.com Phone, Contracting Project: Ben Kane Remodel Party: Location: 21214 8204 Place Vilest Edmonds, WA Thank you for allowing Finishing Edge to bid your concrete project. Please read the "Notice to Customer" statement printed below and "Terms and Conditions' on page 2, then sign and return one copy of this contract for the work listed. We may need four weeks notice to schedule your work. The bid unit prices quoted are offered for 30 days. Finishing Edge reserves the right to correct all clerical or estimating errors in this bid. We are an open shop company. As the owner or general contractor, you are responsible to prepare the subgrade to designed elevations, and proper density. Finishing Edge does not provide flagging, material testing services, surveying, layout, grade work, cold weather protection or joint sealant. Finishing Edge will install concrete work per surveying provided. Changes in engineering at the request of owner/contractor automatically release Finishing Edge of all due responsibility. This bid does not include permits, scheduling locates or form inspections. It is your responsibility to schedule material testing or form inspections. This bid is based on 1 mobilization each for curb & sidewalk. If the project is delayed, phased or not prepared properly additional move ins will be charged at $1,500.00 per mobilization. We may not be able to place concrete in raining or freezing conditions. Traffic and pedestrian control must be in place prior to our arrival (when necessary). We cannot be responsible for damage in our concrete work caused by others. Replacement of the damaged areas may be charged on a Time and Material basis, plus a markup percentage. Wheelchair Ramps requiring truncated domes will be at an additional charge. Payment is due 30 days after billing, net of 5% retention. Retention is due 60 days after the finai invoice date. A finance charge at the current maximum rate will be charged, and Contracting Party agrees to Pay costs of collection, including attormey fees, if payments are not made within these terms. Estimated Item # Quantity Unit of Measure item Description Unit Price Total Price 75 LF Vertical Curb & Gutter 45.00 3,375.00 29 SY 5' x 4` Single Ribbon Sidewalk 50.00 1,450.00 14 SY 5' x 6" Approach 57.00 798.00 0.0€3 0.00 0.00 0.00 0.00 0.00 l i I 1 Approximate Total 5,623. +^— 11,4- - 2-0/f ----------- - - -- -- -- -- - This bid is UNIT PRICE assuming acceptance of all items quoted. Actual measured quantities Y411 be billed at these unit prices. Prices exclude purchaselplacement of any imbeds except reinforcement. Items quoted are based on slipform concrete methods unless otherMse noted. Performance Bond will be provided at an additional cost if requested. Subject to approval by our Credit Department. Notice to Customer: Finishing Edge is registered with the State of Washington, Registration Number FINISEW937BN as a general contractor, and has posted with the State a bond of $12,000 for the purpose of satisfying clagns against the contractor for negligent or improper work or breach of contract in the conduct of the contractor's business- This bond may not be sufficient to comer a claim that might arise from the work done under your contract If any supplier of materials used in your construction project or the contractor on your job does not pay any employee of the contractor, your property may be rrened to force payment. If you wish additional protection, you may request the contractor to provide you with original "lien release" documents from each supplier or subcontractor on your project. The contractor is required to provide you with further Information about Iien release documents if you request it. General Information is also available from the Department of Labor and Industries. Contractor's license expires on January 1 of each year, and is renewed in the normal course of business. IMPORTANT ADDITIONAL TERMS & CONDITIONS ON SECOND PAGE, PLEASE READ BEFORE SIGNING The contract terms are accepted, and Finishing Edge Washington, LLC is authorized to do the work as specified above. Accepted by Contracting Party: Finishing Edge Washington, LLC: Brad Bergman By: By.