Loading...
20080908090728.pdfEagle Eye Consulting Engineers, P.S. PO Box 523 Olalla, WA 98359 hoygeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Theresa Umbaugh 121 5h Ave N Edmonds, WA 98020 Re: Feyk Residence 9705 2361 Place SW Edmonds, WA 98020 Plan Review #: 2008-0519 EECE #: EDM 08-61 Friday, August 29, 2008 MlonnFILM This project is approved for the Ordinance, Structural, V&L4QC and Energy requirements permit. The drawing review has been completed and accepted for permit with the approved stamped drawings returned to the City of Edmonds. The following items have been redlined on the drawing per the engineers request per telephone call on 8/29108 with Harry G. Cretin, PE.. Sheet 8: Detail 5: The V2 lag bolts shall have a length of 6". Sheet 9: Existing plywood when exposed was 318" and this would not transfer the required shear forces. % CDX ply shall be added with nail spacing of 10d @ 6: OIC edges and 12" OIC field. Your plans are being reviewed concurrently with the Building Department, Planning Department, and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department review, when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please call Hoyt Jeter at (360) 874- 0562 between 8:00 am and 5:00 pm. By: Hoyt Jeter, PE President