20080908090728.pdfEagle Eye Consulting Engineers, P.S.
PO Box 523
Olalla, WA 98359
hoygeter@centurytel.net
360 874 0562
Fax 360 874 0591
To: Theresa Umbaugh
121 5h Ave N
Edmonds, WA 98020
Re: Feyk Residence
9705 2361 Place SW
Edmonds, WA 98020
Plan Review #: 2008-0519
EECE #: EDM 08-61
Friday, August 29, 2008
MlonnFILM
This project is approved for the Ordinance, Structural, V&L4QC and Energy
requirements permit. The drawing review has been completed and accepted for permit
with the approved stamped drawings returned to the City of Edmonds.
The following items have been redlined on the drawing per the engineers request
per telephone call on 8/29108 with Harry G. Cretin, PE..
Sheet 8: Detail 5: The V2 lag bolts shall have a length of 6".
Sheet 9: Existing plywood when exposed was 318" and this would not transfer the
required shear forces. % CDX ply shall be added with nail spacing of 10d @ 6: OIC
edges and 12" OIC field.
Your plans are being reviewed concurrently with the Building Department, Planning
Department, and Public Works Engineering. Changes, clarifications or additional
corrections may be required subsequent to the Building Department review, when
comments are received from the other concerned departments.
Should you have any inquiries regarding this letter, please call Hoyt Jeter at (360) 874-
0562 between 8:00 am and 5:00 pm.
By:
Hoyt Jeter, PE
President