Loading...
20081118132633.pdfFAWUIIVINMtll��* U111 '11 Cornerstone Project: 14po Gootechnical, Inc. Owner: 17625 — 130th Ave. NE, C-1 02 Location: Woodinville, WA 98072 Weather: I Purpose of Phone: 426-844-1977 Visit: Fax: 425-644-1987 By: 21214 82"d P1 W M, ("J File No., 2736 Carries Rockeries Date: 11-5-08 Approx. Report No: I Overcast Page: I of 2 Curb Subgrade Compaction By: JRW Test % Density We were onsite at the request of Carries Rockeries to evaluate compaction of curb subgrade. The contractor informed us that sod had been. removed fi-om;. the area of the planned curb line along the east side of the property and existing subgrade needed to be verified as meeting 95 percent compaction. We hand excavated two holes within the curb line and observed that approximately 4 to 6 inches of fill material consisting of brown silty line to coarse sand with gravel and trace organics overlaid native brown silty fine to medium sand with gravel. We probed the - fill subgrade along the curb line and the native soils within the test holes and the probe rod did not penetrate more than an inch in depth. We then evaluated compaction of the fill soils with a nuclear density gauge, It is our opinion the evaluated curb subgrade is firm and unyielding and density test indicate that 95 percent compaction was achieved. Proctor Method: ASTM D698 ._,,_M___A8 TMD 1557 Approx. Approx. Dry Max. Test Feet to Fill Depth % Density Density % % Comments Number Grade (feet) Moist, 0 U 9. 129.6 136 95 95 Pass, Curb �Sub �rade, �21 2 0 0.5 6.9 130.1 136 96 95 Pass, Curb qqb redo„ 14 Attachment: Signed: Distribution: