Loading...
20081120120607.pdfvVILCOX�tONSTRU" P34 - Sth- AvemiUs S,ourh phone C425j, 74 Warren Lafon I A ! :� 1 6 1 1:4RINILC.Dup4_-- �, CIiYCQPY Mr. Lafora, This letter is to confirm the costs of the site work at the Gregory Jantz Building. They break down as follows, Onsite: uttin$10500 Saw Cg $28,000 Excavation & Utilities $6,960 Asphalt & Paving Pavement Marking $850 Site Fencing $2,000 Catch Basing $2,000 $4 131 Contractor Markup Total $45,441 ffsite: O Saw Cutting $1,500 e Asphalt in Alley $2,000 Site Concrete $2,000 Contractor Markup VON, Total $6,050 These costs do not include Washington State Sales Tax. Please do not hesitate to contact me if You have any further questions. Sincerely,, A, 61 Paul Carter pro'ect Manager r ) k, o \AALCOX tON9MU CIONJANC. 234 Stt-i AVenulxt6wth .0hone (4�i 4-253-7-:t- Warreri Lafen - GsdrnGnds, WA 9802-Q 425-7'74-0580 ME= As we discussed, the remodel portion of the Gregory Jantz building consists of remodeling the one (1) office on the ed floor of the building. The costs for this are as follows: New walls 39: LF $1,950 New Door I EA $500 New Carpet 95 SF $285 Paint I EA $75 Contractor OH&P 28-1 'Total $3,091 The total ADA work is as follows:P � ces i gr H/Cpuldng stall IvC ip � $175 Vertical grab ban at exist. Restroorns I& Total, $625 Please let me now if you need anything else. Sincerely, iaul Carter Project Massager