Loading...
20081208162150.pdfNovember 25, 2008 Mr. Jerry Shuster Engineering Department City of Edmonds 121 5`" Avenue, North Edmonds, WAS 98020 NOV (5 2008 RE: Columbia Rim Warehouse Proposed Revisions to Storm Drainage Permit #2007-0684 Dear Mr. Shuster: The purpose of this letter is to document the proposed field changes to the Columbia Rim Warehouse construction plans and to certify that these changes will not result in any negative perfbrmance. We are proposing two changes to the approved construction plans. The 2-60" x 71' long detention pipes and the 3-36" connector pipes, located on the ends of the detention pipes, would be changed to HDPE pipes. The proposed detention pipes and the connector pipes all meet the minimum cover requirements for HDPE pipes (2, minimum cover) and shall be constructed in the field to this standard. The contractor would additionally hike to change the sizes of the 3-36" connecter pipes to 24" pipes, for ease of construction with the 2-48" and 2-54" catchbasins. The inverts will remain per plan for construction. The 36" connector pipes were not designed for detention storage area, so the detention storage volume of the detention system will remain as approved. Per our phone conversation, we understand that these changes are permitted, and we will proceed with these changes, 20021 1201h Ave NE Tel (425) 415 6144 www.esmciviLcom J 1" I [I ft j I Suite 103 Fax (425) 416 0924 Bothell, WA 90011 Tok Free 0661 615 6144 and it v iiI insd " �-I AI' Mr. Jerry Shuster November 25, 2008 Page 2 Please do not hesitate to contact me if you have any additional questions or require any additional information, Sincerely, ESM CONSULTING ENGINEERS, LLC. KRISTAL GREENHAW, P.E. Associate mu$TIT,rs. I W.- my 44esm4lengr4esmjobM1324001 QMdocumentletter-004,doc