Project: Kruger Clinic Canopy
Project Address: 21600 Highway 99
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to Marie Harrison, Senior Permit
Coordinator. Thank you.
1.The drawings do not contain adequate details to perform a complete structural review of
the canopy. Please include details on the drawings for steel column top and bottom
attachments, show what portions of the footings, base plates and columns are to be
reused, and show the structural attachments of the roof frame. If the roof system is to be
independently manufactured, please provide the stamped engineered specifications for
this system from the manufacturer. I assume this is what the PSM Engineering packet
refers to as a secondary structural system. This should also include calculations for the
laminated glass panels.
2.Please provide the structural engineers wet stamp on each drawing on which their
associated details appear.
3.Indicate on the plans that all welding shall be performed by a WABO certified welder.
4.Several detail callouts refer to sheet A2.01, however this sheet was not provided. Please