Loading...
2009-0117 Ace Hardware #2.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: March 25, 2009 TO: Ralph Allen Grace Architects RWAllen@GraceArchitectsPLLC.com FROM: Leif Bjorback, Assistant Building Official nd RE: Plan Check: 2009-0117 2 review Project: Ace Hardware th Project Address: 201 5 Ave S. During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to Theresa Umbaugh, Senior Permit Coordinator. If you like, you may choose to redline your revisions on the plan sets previously submitted. Thank you. 1.Provide a wet-signed copy of the rack anchoring engineering calculations. The design and details provided look to be acceptable. 2.The City is aware of the pending revision for the electrical room door swing and the expected relocation of the adjacent hallway wall. Please show this new configuration on the TI plans.