2009-0117 Ace Hardware #2.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: March 25, 2009
TO: Ralph Allen
Grace Architects
RWAllen@GraceArchitectsPLLC.com
FROM: Leif Bjorback, Assistant Building Official
nd
RE: Plan Check: 2009-0117 2 review
Project: Ace Hardware
th
Project Address: 201 5 Ave S.
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to Theresa Umbaugh, Senior Permit
Coordinator. If you like, you may choose to redline your revisions on the plan sets previously
submitted. Thank you.
1.Provide a wet-signed copy of the rack anchoring engineering calculations. The design
and details provided look to be acceptable.
2.The City is aware of the pending revision for the electrical room door swing and the
expected relocation of the adjacent hallway wall. Please show this new configuration on
the TI plans.