Loading...
20090212151926.pdfProject Name: CITY OF EDMONDS PRE -CONSTRUCTION MEETING Subdivsions, Multi-Fy� rJ P 11 '' A WAIF a 2 MTG DATE: Z 1 TIME: A) Project Contact/Phone #/Fax Permit or Tracking It: Z00%3,C>*(2,T Right -of -Way Per mit#: 5-5 Invited to Attend 3 B City representatives: C;D 8 /,0 C) //00/ Planning �11 Water Division F1 Sewer Division El Storm Division Edmonds Utilities Consortium members,: 0 PUD D Pilchuck/PSE El Verizon NW El Comcast OV' SD Individuals twesent at mee!iM 'low "1 rir __M-1 _11,55e�t rete? (e, G t r JZ_ (9i' 6L ,VW, JA handouts/Reference materials provided: E] Erosion Control standards 0, Engineering Inspection Information El Side Sewer Info Water Service Line Spec. JE;�eNotice : Illegal Discharges to Storrawater System (6/28/04) -Water Outage Policy JO Construction Contractors BMP's, J�4�'aul Routes Traffic T f c Control Requirements EJ Street Standards F1 Retaining Wall El Rockery [:J Other Pre -Con Meeting, Page I of 4 Revised 8/26/04 INSPECTIONS: Engineering Inspection Line: 425- 771-0220, ext. 1326 • Requests for final engineering inspection must be made 48 hours in advance. All other engineering inspection requests must be made prior to 7am each workday morning to receive an inspection that day. • Contractor/Developer must call for inspections. Leave detailed information on the inspection request line stating the work planned for the day. The inspector will try to time inspections in conjunction with the construction activity for the day whenever possible. Call the Development Services Department at 425-771-0220 and inform the front desk of inspection cancellations. Do not call the inspection line to cancel an inspection request for that day. • Large development projects are required to call the inspection line daily to keep the inspector informed of the work planned on site for the day, whether an inspection is required or not. • City of Edmonds inspectors will provide inspections as requested and may stop by periodically as deemed necessary. • Special inspections performed by licensed engineers/engineering firms does not eliminate the requirement to have an inspection performed by a City inspector. All test reports created by the special inspector must be provided to the City within one week of testing. • All sections of pipe are to be inspected after installation and prior to backfill or as determined by inspector on a project specific basis. All connections (i.e. Joints, Tees, CB's, MH's, etc.) and thrust blocks must be inspected prior to backfill. Mobilization and Erosion Control 14 14. ,eve. City of Edmonds Standard Details: E 1. 1, E1.1.1, E 1. 2, E I . 3, Filter fabric fence, quarry spall rock construction entrance, filter socks in CB's, sediment pond, dust control, covering of stockpiles,, etc. All erosion and sedimentation control measures are to be implemented at the start of the project and shall be maintained for the duration of the project. Erosion control measures shall remain in place until all exposed soils are vegetated. Exposed soils shall be covered within 2 days during the winter months (Oct. to April) and 7 days during the summer months (April to Oct). 'Tt—a ,P1 rghci'iaifi,�iob shack & equipment within the right-of-way (ROW permit required). F-1 Tightline Inspection for positive flow or slope required per plans, approved material type, proper bedding, etc. Pre -Con Development, Page 2 of 4 Revised 2/13/06 The footing drain shall not connect to the storm detention system. Connection shall be made to the outfall side of the detention control structure, For subdivisions, a stub to each lot is, required. I Construct per approved plans. Bed in pea gravel or crushed rock to springline, Verification of control structure orifice's required prior to installation. Mudding required inside and out at all pipe connections to CBs and M.H's as well as each riser and pick holes. Ej Sanitary Sewer — main extension / lateral / side sewer Core drill, Romac insorta-tee - inspection required at time of core drill; coupon to be verified. Manhole installation: core -n -seal boots — mudding required on inside of Manhole up to approximately the middle of the pipe (channel level) and also inside the entire boot, Pressure testing: Air test at 4 PSI for 1.5 minutes, Channeling TV records Water System —main extension / fire line / domestic service line Water Outage Policy (12/12/03) Inspection of trench and valve cluster required by 11: 3 Oam the day before the outage. Thrust blocking per City standards — inspection required prior to backfill. Use of water from a hydrant requires a hydrant meter w/ backflow device, to be obtained from City of Edmonds Public Works Department — 425-771-0235. Install jumper off City water main to test new water system prior to connection to City main. Pressure testing: Thrust blocks must be in place a minimum of 3 days prior to testing. Main line: Test at 225 PSI for 2 hours Fire line: Test at 200 PSI for 2 hours Purity testing: Contact Public Works Water Quality Control Specialist — 425-771-0235 Backflow prevention: Contact PW Water Quality Control Specialist — 425-7710235 City crew shall operate all existing valves except in emergency situations. JP' For Inspections Curb/gutter and sidewalk form inspections required prior to pour. City inspector must give apptoval of forms before pour, _5 Monolithic pours are not permitted. Pre -Con Development, Page 3 of 4 Revised 2/13/06 Existing failed or damage sections of curb/gutter and sidewalk are to be replaced as determined by the City inspector. D Traffic Control Traffic Control plans must be approved for use prior to implementation, Approved plan and designated haul route to be followed, Certified flaggers required, Asbuilts Provide City of Edmonds with "electronic drawings" of asbuilts, El Trench P atch/C omp action CDF required on major arterials. CDF to cure 3 days before paving, Compaction tests required in City right-of-way. 95% compaction must be met, E:1 Noise Restrictions Construction hours are M -F, 7ana-6pm and Saturdays, 10am-bpm.. No work Sundays and Federal Holidays, Enginee ring Comments: ,5, e -s. v, 4- 5 o 0,�4, 6a, k tf- TC,_,,, , "C"A'r"r -Ad*- IOP 5 'r - ve, 5 ,,4,. Planning Comments: ""If", c./ '",,e e_ 4 W"k e- t.% 14S ;1, �9 ",I ek Public Works Comments: AP EUC Comments: Contractor/Developer Comments: I;a, 64, I2 al 4" i"z,-ee 4, Pro -Con Development, Page 4 of 4 Revised 2/13/06