Loading...
2009-0231 Dock Ramp.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: May 29, 2009 TO: Christopher Keuss Port of Edmonds c/o bborth@portofedmonds.org FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2009-0231 Project: Ramp Replacement Project Address: 336 Admiral Way During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to Theresa Umbaugh, Senior Permit Coordinator. Thank you. 1.We received your structural calculations for the shore side structure modifications, however in addition to these we need calculations and construction details for the ramp itself, the ramp connection to the structure, and for the addition of floatation units to the off shore dock. Please include all necessary details in the plans.