Loading...
20090317100450.pdfConfirmation Page Page 1 of 2 pscIeanair.org Puget Sound Clean Air Agency Notification Confirmation on May 22, 2008, the Agency Board of Directors approved a fee increase to cover asbestos program costs. The fee change became effective July 1, 2008. Fee Information: (Fees Last Revised 7/1/2008) Please review the following information you have submitted. If a change is needed, select the Modify Notification Information button. Notification Fee. Asbestos Demolition $75.00 Emergency Total $75.00 Owner's Name BNSF Railway Phone (206) 625-6264 Site Address 191 West Dayton Street Site City Edmonds Zip 98020 Contact Person Don Omsberg Phone (205) 625-6264 Mailing Address 2454 Occidental Ave. S. Suite 2D Seattle, WA 98134 'his project Includes multiple structures. Each structure's number and street address: Iris project consists of demolishing on actual permanent structure and 4 ilnivan portable structures that are parked around it at the 191 West Dayton address. This project includes a demolition. Demolition Start Date 03/16/09 Completion Date 04/16/09 Demolition will be completed by a demolition contractor Demo Contractor Derrick Construction Industries, Inc. Contractor Job # Edmond Contact Shane Johnson Phone (952) 894-0012 Mailing Address 7217 W. 128th Street Savage, MN 55378 https://secure.pseleanair.org/Asbestos/Confinn.aspx 2/23/2009 Alter payment, Project Categories when can I start Asbestos Fee Demolition Fee my project? Single -Family Residence Project Asbestos removal only Today $30 L$O—$75 Demolition (with or without IlDemolition - In 10 Days75 asbestos removal) Asbestos Removal - Today Project other than Single -Family Residence with < 10 linear feet and/or Demolition - In 10 Days $0 $75 48 square feet of friable asbestos >= 10 - 259 linear feet and/or sbestos Removal - Today $75 0 Demolition- In 10 Days $75 >= 48 - 159 square feet of asbestos 260 - 999 linear feet and/or 160 - 4,999 square feet of asbestos In 10 Days $250 11 $75 >= 1,000 linear feet and/or >= 5,000 square feet of asbestos In 10 Days $750 $100 If your project is an Emergency, an additional fee may apply. Emergency Demolition orToday applicable fees + $50 Emergency Asbestos Removal* *Single-family residences are exempt from the emergency fee. Please review the following information you have submitted. If a change is needed, select the Modify Notification Information button. Notification Fee. Asbestos Demolition $75.00 Emergency Total $75.00 Owner's Name BNSF Railway Phone (206) 625-6264 Site Address 191 West Dayton Street Site City Edmonds Zip 98020 Contact Person Don Omsberg Phone (205) 625-6264 Mailing Address 2454 Occidental Ave. S. Suite 2D Seattle, WA 98134 'his project Includes multiple structures. Each structure's number and street address: Iris project consists of demolishing on actual permanent structure and 4 ilnivan portable structures that are parked around it at the 191 West Dayton address. This project includes a demolition. Demolition Start Date 03/16/09 Completion Date 04/16/09 Demolition will be completed by a demolition contractor Demo Contractor Derrick Construction Industries, Inc. Contractor Job # Edmond Contact Shane Johnson Phone (952) 894-0012 Mailing Address 7217 W. 128th Street Savage, MN 55378 https://secure.pseleanair.org/Asbestos/Confinn.aspx 2/23/2009