2009-0354 Beehive Espresso2.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
Email sent to B Kim and A Tagle on July 8, 2009
Alan and Benny,
Thank you for providing responses to my recent comment letter for Beehive Espresso. It appears
that all of the Building Division issues have been satisfied except for a couple:
1.The resubmitted plan sheets must be signed by the architect.
2.The Alternate Methods and Materials proposal for the self-contained plumbing
fixtures is incomplete. Please include the following information, at a minimum.
a.The request should be identified as an Alternate Methods and Materials
proposal, referencing UPC section 301.2 and addressed to the building
official, Ann Bullis.
b.Explain why it is not feasible or reasonable to connect the fixtures to the
facilitys existing supply and drainage systems.
c.Technical documentation demonstrating that the proposed installation is at
least equivalent to the provisions of the UPC. (You have already provided
some information for this purpose in your latest submittal.)
d.A nonrefundable fee of $210 must be paid at the time of the request.
Once these items are addressed, Ann will be able to make a formal decision on whether or not to
allow the plumbing units. Please contact me if you have any further questions. Thanks
Leif Bjorback
Assistant Building Official
City of Edmonds
(425) 771-0220