Loading...
2009-0360 Red Pho Plumbing.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: June 23, 2009 TO: 5 Corners Plumbing LLC Kenji Fujii kenjifujii@hotmail.com FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2009-0360 Project: Re Pho House Plumbing Project Address: 23830 Highway 99 During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1.Please show the prep sink meat and the prep sink veggie on the schematic diagram. Show the floor sinks that each of these drain into. 2.Is there a meat sink in the 3 compartment sink? This is unclear when comparing the floor plan piping to the schematic diagram. 3.The sanitizing sink in the 3 compartment sink must be shown as draining to the graywater drain without draining through the grease trap. 4.Show venting for the grease trap on the schematic. This is to be per the manufacturer. 5.Show an indirect drain from the ice maker. 6.Indicate what kind of backflow prevention is provided for the ice maker, either an air gap or an RPBA. 7.The maximum number of drainage fixture units on a 1½” vent is 8. Please show where the common vent is upsized to 2”. Note-it would be helpful and provide more clarity if the DWV system was drawn in an isometric format rather than just a schematic. Thank you.