Loading...
2009-0380 McCoy Deck Repair.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: June 22, 2009 TO: A Better Handyman Service Betterhandymanservice@hotmail.com FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2009-0380 Project: McCoy Deck Repair th Project Address: 8614 238 St SW During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. Thank you. 1.It appears that the deck coating used is not approved by the International Building Code. The ASTM listings on the Speedliner website do not match those in IBC Section 1507.15.2 which states: “Material standards. Liquid-applied roof coatings shall comply with ASTM C 836, ASTM D 1227, ASTM D 3468, ASTM D 6083 or ASTM D 6694.” Either provide verification that Speedliner 1000 is recognized and approved by the IBC or use a product and installation that is. If the product is not recognized by the IBC, you have the option to submit a request to use “alternate materials” as prescribed in Section 104.11. This would require that you submit evidence of reports and/or testing sufficient to prove that the material is “for the purpose intended, at least the equivalent of that prescribed in this code in quality, strength, effectiveness, fire resistance, durability and safety.” This submittal would include a non-refundable fee of $210, and does not guarantee an approval by the building official.