2009-0380 McCoy Deck Repair.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: June 22, 2009
TO: A Better Handyman Service
Betterhandymanservice@hotmail.com
FROM: Leif Bjorback, Assistant Building Official
RE: Plan Check: 2009-0380
Project: McCoy Deck Repair
th
Project Address: 8614 238 St SW
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Please provide written responses as to where the changes can
be found on the plans, and submit revised plans/documents to a Permit Coordinator. Thank you.
1.It appears that the deck coating used is not approved by the International Building Code. The
ASTM listings on the Speedliner website do not match those in IBC Section 1507.15.2 which
states: Material standards. Liquid-applied roof coatings shall comply with ASTM C 836,
ASTM D 1227, ASTM D 3468, ASTM D 6083 or ASTM D 6694. Either provide verification
that Speedliner 1000 is recognized and approved by the IBC or use a product and installation
that is.
If the product is not recognized by the IBC, you have the option to submit a request to use
alternate materials as prescribed in Section 104.11. This would require that you submit
evidence of reports and/or testing sufficient to prove that the material is for the purpose
intended, at least the equivalent of that prescribed in this code in quality, strength, effectiveness,
fire resistance, durability and safety. This submittal would include a non-refundable fee of
$210, and does not guarantee an approval by the building official.