20090406140621.pdfEDS �.. �.b Will �Sr. 1 S90 DATE: 4/6/09 TO: Terry Vehrs 11128 Algonquin Rd Woodway, WA 98020 FROM: Pat Lawler City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771.-0220 RE: Plan Check: BLD20090154 Project: Foundation repair Project Address: 8229 188'.St SW During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1. Provide engineering requirements for cripple wall sheathing where siding and sheathing has been removed. 2. Provide a completed city Special Inspection Form signed by the structural engineer who will be locating the pin pile placement along the foundation wall as required by page (3), under deck area, of the HWA geotech report, project #2007-000-21 T063 3. Provide a completed city Special Inspection Form for the welding special inspections if either: a. Any field welding will be performed b. The fabrication shop is not a registered, approved shop meeting the requirements of IBC Section 1704.2 4. The pile plan submitted by the contractor indicates the point of refusal for the pin piles as <1" of penetration in 60 seconds with a 901b jackhammer. The geotech report describes on page 3 the point of refusal to be <1/2" penetration per minute with a 140" jackhammer. The pile plans need to meet the minimum standards required by the geotech. 5. Respond to attached City's consulting engineer's comments. 6. Depending on the respose to item (5) above, special inspection and a city Special inspection form may be required for the pin pile anchorage to the foundation Pat Lawler patnck.lawler@ci.edmonds.wa.us Plans Examiner 425 7710220 x 1703 Eagle Eye Consulting Engineers, P.S. PO Box 523 Olalia, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Marie Harrison City of Edmonds Building Dept. 1215"' Ave N Edmonds, WA 98020 Re: Vehrs Residence — Foundations Stabilizations 8229 188`" St. SW Edmonds, WA 98026 Plan Review # 20090154 Plan review number 01 RECEIVED MAR 312049 pEVE CITY OFtEDMONDS ES CTi3. EECE # EDM 09-04 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural Only requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. STRUCTURAL COMMENTS General 1. Please submit a floor plan showing the directions of the floor member in order to check the required force the pile are to resist. All that is shown is a schematic floor plan. There is not enough information to complete the review without this information's. Page 2 of 2 Plan Review Number 01 EECE#: EDM 09-04 Vehrs Residence -Foundations 2009-0154 2. The submitted information does not provide how the angle bracket is connected to the concrete stein wall. All that is noted is the 3/4" anchor bolts. Anchor bolts are cast into concrete but the walls are existing. Please submit the information for the connections is order to check capacity. Are expansion bolts being used, or epoxy bolting, etc. Analysis should also be submitted to justify the repair. Sheet Pile King Bracket 3. Please specify the required weld for the plates. Nothing is specified at this time. 4. EOR, please specify the grade of steel that is going to be used for the steel bracket in order to check capacity when the floor and roof framing system is submitted. 5. EOR, please specify the required embedment of the 3/a" Anchor bolts for the bracket attached to the existing stem wall. See general comment. 6. Please note special inspections for the 1/4" Fillet weld of the Pile welding to the angle bracket. Sheet Pile King Plan 7. The geotechnical report state double extra strong galvanized pin piles shall be used. However, the plan state schedule 80, which is not double extra strong as per AISC. Please modify the plan to clearly state double extra strong as recommended by the geotechnical report. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874-0562 between 5:00 a.m. and 5:00 p.m. By: .'� 117�� Hoyt Jeter, P.E. President