2009-0466 Yacht Club Plumbing #2.pdf
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE: July 31, 2009
TO: Bryan Singleton
West Side Plumbing & Design
rd
410 3 St.
Steilacoom, WA 98388
FROM: Leif Bjorback, Assistant Building Official
RE: Plan Check: 2009-0446
Project: Edmonds Yacht Club Plumbing Review #2
Project Address: 326 Admiral Way
During review of the plans for the above noted project, it was found that the following information,
clarifications or changes are needed. Items that are in italics appeared in the previous review letter
and have not been sufficiently addressed. Please submit revised plans/documents to Theresa
Umbaugh, Senior Permit Coordinator. Thank you.
Previous item #1. Please show on the plans the sizing and discharge locations of the
1.
roof drain leaders and conductors. Note that the City of Edmonds does not allow
separate discharge of the secondary roof drainage system, so a combined system will be
required, designed per UPC 1101.11.2.2.2. The roof drains are included in the fixture
list, and must be shown on the plans.
2.Previous item #2. Show floor drains at the second floor restrooms. UPC 411.2.1
3.Previous item #3. Indicate trap primers at all floor drains. UPC 1007.0
4.Previous item #5. In the Galley, show clearly the multiple-compartment sinks, label
them for their respective use, and show how each compartment is drained. (The City
does not allow non-grease producing drains to drain through a grease interceptor. Grease
waste lines will also be reviewed by Jon Lein, Wastewater Pretreatment Technician.)
th
5.Previous item #8. Please show the location and piping for the 4 hose bibb.
6.Previous item #9. Please explain what is meant by the Looped notation at the hot and
cold lines to the Bar area.
7.Previous item #10. Indicate supply and drain piping for the dishwasher, and an RPBA
for the (dishwasher) supply line.
8.Previous item #11. Indicate the type of backflow protection provided at the ice maker
whether an air gap or RPBA.
9.As per Linda McMurphy, Edmonds Public Works Cross Connection specialist, the
RPBA on the main supply line must be in a hot box at the meter. Please note this on the
plumbing plans.
10.The latest CAD drawing is barely legible. Please provide a more legible copy with the
next resubmittal.
Page 2 of 2