2009-0569 Boohan Plaza.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: September 3, 2009 TO: Ki Nam, Architect Arch/Tech International kinamarchitect@yahoo.com FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2009-0569 Project: Boohan Plaza Project Address: 23720 Highway 99 During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to Linda Thornquist, Permit Coordinator. Thank you. 1.The change from the former use of a restaurant (B occupancy) to a retail store (M occupancy) constitutes a “change of occupancy” as defined by the International Building Code. Please submit revised plans to address this scope of work. IBC 3406 2.Indicate on the plans any walls, equipment or fixtures that were removed from the previous use. 3.It appears, from visiting the site, that the parking configuration approved by the previous city building permit has been altered. Please show on the plans that there are to be no alterations to the previously approved parking, and restore the striping accordingly, or provide a new site plan for city review that shows proposed changes to the parking area, including an accessible parking stall. 4.The site visit also revealed that the restroom doors are not in the same locations as shown on the drawings. Please alter the drawings to show the doors as remaining in their current locations, or being relocated, whichever applies. 5.The alterations require accessibility upgrades per WAC 51.50 (IBC 3409.7). On the plans clearly show that the entire exterior and interior accessible route of travel complies with current code, or provide upgrades per the previously referenced section. If you choose to use exception #1 of that section, provide a letter stamped and signed by the architect (reference the code exception), stating the overall project cost, 20% of the project cost, and list the accessibility upgrades that will be done as part of this permit as well as showing that the total cost of the upgrades is at least 20%.