Loading...
2009-0588 Twist Yoga Mechanical.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: September 3, 2009 TO: Joe Cederna System Heating & Air Conditioning jcederna@systemheating.com FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2009-0588 Project: Horizon Bank Mechanical th Project Address: 122B 5 Avenue S During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to Theresa Umbaugh, Senior Permit Coordinator. Thank you. 1.Provide exhaust air in approximately the same quantity as the outdoor air supplied. Show on the plans that the exhaust is at least 10 feet away from the mechanical air intake. IMC 403.1, 403.2.1 and 501.2