20090612133500.pdfTERRA ASSOCIATES, Inco
Cor'5"1t719t5 ill Geolechnical Engineering, Geology
and
Environmental Earth Sciences
October 8, 2007
Project No. T-4893-1
Mr. Ross Woods
Point Edwards, LLC
2801 Alaskan Way, Suite 107
Seattle, Washington 98121
Subjecl: Final Report — Geotec[mical Observations
Point Edwards Condominiums — Buildings 617
21131 Pine Street
Edmonds, Washington
References. 1. Preliminary Geotechnical Report, UNOCAL Site, Project No. T4893,
prepared by Terra Associates, Inc., dated November 21, 2001
2, Steep Slope Hazard Review, -Point Edwards Condominiums C UNOCAL Site),
Project No. T-1893, prepared by Tetra Associates, bic„ elated December 13, 2002
3. Geologically Hazardous Argas Review, Point Edwards Condominiums (UNOCAL Site),
Project No. T-4893, prepared by Terra Associates, Inc., dated January 20, 2003
4_ Response to Plan Review Comments, Buildings 6 and 7 Foundation Plan Review,
Point Edwards Condominiums, Project No. T-4893, prepared by Terra Associates, Inc.,
dated August 2, 2006
5. City of Edmonds Special I.ttspection and Testing Agreement, Point Edwards Condominiums,
Buildings 617 and Amenity No. 2, dated July 17, 2000
Dear Mr. Woods:
As requested, we provided geotechnical engineering observation services during construction of Buildings 6/7 of
the subject project. The purpose of our work was to verify that geotechnical engineering elements of construction
were completed in accordance with our recon-miendations and construction drawings approved by the City of
Edmonds. We previously submitted copies of our field memos to you, Longitude 122, LLC, and the City of
Edmonds. Our geotechnical observations were as follows:
1. Excavation Q15,yervalion
We observed thQ excavation for Buildings 6/7. All excavation& the observed were completed in general
conformance with our recommendations.
-12525 Willows Road, Suite 101, Kirkland, Washington 98034 RECEIVED
ED
Phone (425) 82-1-7777 a Fax (425) 827-4334
LCiG 1TEM#off
FEB ? ') 2_��
ni m n1kir_1 r° rOT
Mr. Ross Woods
October 8, 2007
2. Stractural Fill Material au i Required Cmapaciion Verification
We performed periodic observation and compaction testing of structural till placed in the building interior and as
wall backfill. Based on the results of our field density testing and our observation of contractor means and
methods, it is our opinion that the structural fill we observed was placed and compacted in general accordance
with our recommendations.
3. Soil Bearing Verification
We observed prepared foundation subgrades for Buildings 617, Foundation subgrades consisted of dense to very
dense native silt and hard clay or structural fill consisting of at least three feet of compacted crushed rock. These
materials are adequate for support of foundations designed for an allowable bearing capacity of 5,000 pounds per
square foot (psf).
4Building Drainage Verification
We observed subsurface drainage placed around the perimeter of Buildings 617. All drainage systems we
observed were installed fn general accordance with our geotechnical recommendations and the approved project
plans.
Conclusions
Based on our observations and the results of our Field testing, it is our opinion that the geotechnical items
discussed above were completed in general conformance with the recommendations presented in the referenced
geotechnical reports and with the construction drawings approved by the City of Edmonds.
We trust the information presented is sufficient for your current reeds. If you have any questions or require
additional information, please call.
Sincerely yours,
TERRA ASSN 1111PS14
Jelin Cr—€iLr a 1-1,0.'
Projer, ' " ager -
��_ µms.
t
Tlieada3_
prictcial ��
c: Iffi . i—t MOr.. f-Ottgittde 122, LLC
I IT
ro
ect No. T-4893-1
RECE gD Page No. ii
FEB 2 2 2008