Loading...
20090624112646.pdfo p� City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION Est sgo (425) 771-0220 DATE: June 22, 2009 TO: Alan D. Tagle alantagle@hotmail.com FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2009-0354 Project: Beehive Espresso Project Address: 23830 Highway 99 During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. Thank you. 1. Please show on the plans the code analysis for this change of use, including the occupancy group, occupant load and construction type. 2. Please provide an accurate site plan showing the drive-through and car stacking area. 3. On the site plan show an accessible route from the exit to a public way as well as to the restroom. If the route travels through or across a driveway, show how it will be permanently marked. 4. Show a code compliant landing at the exterior door. IBC 1008.1.5 5. Provide an exterior light fixture at the exit door or show how the exterior landing is lighted per IBC 1006.1. 6. The Uniforms Plumbing Code requires that all plumbing fixtures be connected to the building water supply and the building drainage systems. Self contained sinks are allowed only under an "alternate materials and methods" request to the building official according to UPC Section 301.2. Technical documentation shall be submitted to the City to demonstrate equivalency to the UPC for review by the building official. A non-refundable fee of $210 must accompany the submittal. Approval of the request is not guaranteed. 7. Provide a letter of understanding from the building owner allowing occupants/employees of the space to use the restrooms in the building. 8. Provide a copy of the approval letter from Snohomish Health District. I. .3''s��jo&Ao0