Loading...
20090728073628.pdfJUL 21P. 2909 su�®E®DSCi® Wednesday, July 22, 2009 Subject: Revision Plan Check: BLD20090154 Project: Foundation Repair Project Address: 8229 188t" St. SW This revision to Plan Check #20090154 involves a continuous 18" footing, with (2) #4 re -bar, poured under the existing footing on the Glacial Till bearing soil. In order to achieve a continuous footing the re -bar shall overlap 20" at cold joints. Under the (4) 4"x6" posts, 30"x30"x12" pads will be poured, with 12" sonotubes to support the existing footings. All new footings will be placed on the Glacial Till bearing soil. We will not use "pin piles" as suggested by HWA Geosciences, Inc.. Terry Vehrs Agent: Jeff Vehrs 206.227-9501 jnee4@comcast.net CITY COPY