Loading...
20090728073943.pdfHWA GEOSCIENCES INC. U(:�'o liical Q'- i0;v1';1;" iN !:;:,, i1;4 PROJECT MEMORANDUM TO: Terry Vela's C. PREPARED BY: Tom. Kinney HWA GeoSciences Inc. SUBJECT: Addendum to HWA Report dated October 31, 2007 Related to Stabilization of the House at 8229 188t" Street SW Edmonds, WA PROJECT'NTO.: 2007-000-21 T063 PIM DATE: June 6, 2008 Pile King has been selected to drive the pin piles recommended in the HWA report dated October 31, 2007. The HWA report and the Pile King work plan were submitted to get the permit. There were discrepancies between the HWA report and the Pile King work plan and the Zn needs of the project have change. This memo includes several comments that will bring the work plan and the report into compliance and will focus. both on the needs of the current project. 1. The pin piles will be 2 -inch, Schedule 80, galvanized pipe. (Modification to HWA Report) 2. The pin piles will be driven to refusal with a 90 pound jack hanuner. (Modification to HWA report) 3. HWA will locate the pin piles. (Modification to HWA report) 4. The footings will. be stabilized in place without changing their elevation. (Modification to I -TWA report) S. Six piles will be used along the foundation wall and two will be placed on the roof support columns. (Modification to Pile King drawings) RECEIVED MAR 18 2509 DEVELOPMENT SERVICES CTR - CITY of EDMONDS 19730 64(li Aven Lie W'. Suite 200 Lynnwood, t-Vk 99036.5957 Tel: 425.774.0106 Fax: 425.774.2714 WIMIwageo.com 'a N t`N O McDowell NW Pile King, Inc. BRACKETPILE FOUNDATION REPAIR Side-wall attachment for deep foundations. Bracketpiles are a combination of heavy steel angle bracket and steel pipe piling. They are -used to prevent further settling of foundation where deep excavations are not appropriate. O{'4h6 U, sleeve is driven into top of pile 12" 0 '�.f— ---- 2"TYp• 00 0 12" 0 I 12" 2"TYp• ___ distance to be field Measured 1.) Excavate alongside existing foundation wall,.typically 12" -18" is sufficient to install bracket below grade . 2.) Determine width of footing and position pile accordingly - approximately 6" from existing wall 3.) Drive 2", 3", or 4" pipe pile to appropriate refusal critieria as vertically and as close to footing as possible 4.) Cut off pipe pile appropriate height and measure distance from wall to center of pile 5,) Custom fabricate each bracket by welding bracket sleeve at the same position as pile measured in (4) above 6.) Install bracket into pile, rotohammer thru bracket holes 7.) Install 4 each 314" anchor bolts 8.) Backfill excavated area and thouroughly handtamp -- Side-wall brackets are shop fabricated Using 112" 8" x 8" or 1f2" 12" x 12" plate stock and 112" thick g usset. -- The sleeves are custom fit for each bracket location. -- All welding is done by certified welders. PIN (PIPE) PILE= FOUNDATION * RETAINING WALLS' MANTA RAY EARTH ANCHORS * HELICALS 18905 84' AVENUE SOUTH, KENT, WA 98032 (425) 251-8535 FAX (425) 251-5940 WEB—www.pileking.com EMAIL--mcdowelipileking@yahoo.com