20090930105815029.pdfMessage
Harrison, Marie
From: Clugston, Michael
Sent: Thursday, September 24, 2009 10:37 AM
To: Harrison, Marie
Subject: FW: Anthony's Edmonds Re -Roofing
Marie,
Page I of 2
This email is in response to my comments for BLD -2009-0802, the Anthony's roof work. If could reassign me the
permit, I'd appreciate it.
Thanks.
Mike Clugston, AICP
Planner
City of Edmonds
Development Services Department
P: 425-771-02201 F: 425-771-0221
michael.clugston@ci.edmonds.wa.us
-----Original Message -----
From: Weylin Thompson[mailto:Weylin.Thompson@MulvannyG2.com]
Sent: Wednesday, September 23, 2009 4:13 PM
To: Clugston, Michael
Subject: Anthony's Edmonds Re -Roofing
Mike,
Thank you for the in depth response on the review comment, it helps us to understand the issues a lot more.
Attached is a PDF file of the fax regarding the one outstanding item of the roof height. The following is our
response to your comment.
Response: You are right that the calculation was made from the 1 st finish floor as it appears on the
drawing. The fact is the building is a slab on grad building and has no steps when entering the first level. Though
we are not providing a survey of the site with this submittal the terrain throughout the general vicinity of the
building is relatively flat. The asphalt is flush with our building slab, and if anything we are below the average
grade by 6 inches because of the Port of Edmonds esplanade walkway the wraps around the North and West
side of the building. It is safe to say that the average grade is the same as the elevation of the 1 st finished floor.
In addition to that side of the coin, most jurisdictions have a policy that allows a building owner to do repairs and
replacements with out the need of a permit. Would this not fall under those circumstances. We are simply
replacing what is already in place with a more sturdy, and sustainable product. The siding material is a standing
seam roofing material that will now match the existing metal panel roof already on site. This should be a more
aesthetically pleasing option for all that see it. We ask that you please accept our reasoning on this and hope
that this satisfies the cities review of the project.
Sincerely,
I eoln Tfiompson j Associate
Project anagen
Creating Boniness Value Through Inspired Design
9/24/2009
tviessage
MulvaiinyG2 Architecture
i
::1.10 1, 3.2th Ave NE I Suite 500 1 Bellevue, WA 98004
0, 425,463,1574
F;425,463,212S
E. �/veylii�i.tiioii-)psc)i�@i-nt.ilv,-3i-inyg2,com
W. www.mulvannv(12.com
. . .. ...... .... ...
'38 Vearn of DESIGN AT WORK
Beflevue., LVA 11 Por'Cf,,rid, OR I Irvine, CA I Washingcm, DC." I Sharlghai, €:€i raze
< tie tiara EFn(s ; f Uis e.-wailand, :any confidential and the property of Mulwanny(.i2 Arc; do. tore.
fllaasO C.onsidbr the elivirmirnerit before printing this ornail,
<<Anthony's Edmonds Round 2 Comments.pdf>>
9/24/2009
rage 2 of 2