Loading...
20091105160726407.pdfars City of Edmonds � �d 00PLAN REVIEW COMMENTS BUILDING DIVISION FSt 4 �9p (425) 771-0220 DATE: 11/5/09 TO: Stevens Hospital 21601 76"' Ave W Edmonds, WA 98020 RE: Plan Check: BLD20090720 Project: ED Remodel Project Address: 2160176"' Ave W During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1. Provide listed wall assembly detail, on the full size plans, for two hour fire rated assembly to be used to infill door opening at former security room, Triage 2. Detail C-7 lists several different U.L. listed wall assemblies, but the details are not provided. 2. Corridor walls are to be constructed as smoke partitions, IBC 407.3. Indicate the materials and method of treating gypsum joints to prevent free passage of smoke above ceiling level and at the head of wall. If the floor above a fluted deck provide smoke seal details. 3. Contact the PSCAA for asbestos survey and abatement requirements regarding renovation. 4. Complete the enclosed special inspection form for welding. 5. Identify accessible door hardware for 90 minute fire rated door, and corridor door with smoke seal. Corridor doors require positive latching, per section 407.3.1. 6. Special inspection is required for x-ray of tendons in post -tensioned concrete, prior to driving powder actuated pins. Complete the attached city special inspection agreement. 7. HVAC: a. Is the space above the ceiling a plenum? Identify the return air grill size and locations. b. Indicate duct and/or air transfer openings through the smoke partitions. c. Identify smoke damper locations at smoke partition air transfer openings, if applicable, per section 710.7 Pat Lawler patrick.lawler@ci.edmotlds.wa.us Plans Examiner 425 7710220 x 1703 r 4r INSPECTIONSPECIAL ACTEWEV SSE. t 09(1 PERMIT 9� PROJECT SITE ADDRESS: 6 0 lqu- 60 PROJECT AME: L;" DATE:-- '- SPECIAL INSPECTION AGENCY *One farms must be completed by each. Special Inspection Agency or Inspector. SPECIAL INSPECTIONS RE, QUIRED: Special inspections are required for this project in accordance with. IBC Chapter 17 or in accordance with IRCR109.2 as applicable. IBC Section 1.704.1 requires the owner or the registered design professional in charge to employ an independent testinglinspection agency/special inspector to perform required special inspections. The independent agency hired to perform the duties of special inspection is required to be a registered agency with WABO under the Special Inspection Registration Program (SIR-'). The special inspector shall be a qualified person with competence for inspection of the particular type of construction or Ioperation requiring special inspection (SOQ may be required by the Building, Official). The owner, registered professional, contractor and special inspector/agency shall complete the attached forth and submit directly to the Building Division. WORK REQURING SPECIAL INSPECTION: Special .inspections will be required for the following, categories of work in accordance with IBC Chapter 17 and IRC R109.2: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL. INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION CATTACHED EIAPPROVED PLAN SHEET • Fabrication (1704.2) ❑ Wood Construction (1764.6) • Steel Construction (1704.3) o Soils (1704.7) n Concrete (17114.4) a Bolts installed in Concrete (1704-13) • Special Moment Resisting Concrete. Frames (1704.4) ❑ Reinforcing Steel, Prestressing Steel Tendons (I 704A) • Structural Welding, (1704.3. 1) 01ligh Strength Bolting(1704.3-3) rt Masonry (1704.5) o Reinforced Gypsum Concrete (1704.4) • Struclural Masonry for Seismic Resistance (1708-1) o Structural Observation (1709) • Insulating Concrete Fill (1704-4) o Spray .Applied Fire -Resistive Materials (1704-10) • P'iling, Drilled Piers, and Caissons (1704.8, 1704.9) o Shotcrete (1.704.4) • Pier Foundations (1707.5) ❑ Structural Steel (1707.2) • Grading, Excavation, Fill, Proof Rollin (1704.7) o Smoke -Control Systems (1704.14) n Exterior Insulation and Finish Systems (1704°12) u Designated Seismic Systems (1707°9) o Mechanical Components (1707.8) o Cold Formed Steel Framing (1707.4) • Storage hacks (17076) o Architectural Components (1707.7) ® Structural Wood (1707.3) o Special Cases (1704,13) • Seismic Isolation System (1707.10) o Mastic, Intumescent Fire Resistant Coatings (1704.11) 0 ri High Load' Diaphragms (1704-6- 1) cs BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached Special Inspection Information Form, including, the required acknowledgements and return to the Building Division for approval prior to permit issuance. WABuildingNIJANDOUT ICODES\FORI'+rIS\SPECIAL INSPECTION AGREENMNT FORM.doc7107 APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections_ The company performing inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifications to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections are to be performed on a continuous basis ------meaning that the special inspector is on site at all times observing .the work requiring special inspection. Periodic inspections are permitted only as specifically noted in the approved project plans in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifications, and approved by the Building Official. 2, REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official by telephone at (425-771-0220) or in person at City Hall, of the plan, deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect of record. 3. DAILY REPORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inspections. The daily reports shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description and date of daily inspections and tests made with applicable locations • List of all non -conforming items and locations • Report on status of non -conforming items (how each was resolved or unresolved) • Field changes authorized by the Architect, Engineer or City inspector if not included in non-conformance items. W_1Building\HANDOUT ICODESIF'ORMSISPECIAL INSPECTION AGREEMENT FORM.doc7/07 5. FINAL CONSTRUCTION REPORT The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection; when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities L NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the j obsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division Responsibilities I. APPROVE SPECIAL INSPECTION The Building Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE OF OCCUPANCY The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the fwal report have been submitted and accepted by the City. D. Owner Responsibilities I. The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities 1. Prepare Statement of Special Inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. WABuildingTANDOUT ICODESTORMSISPECIAL INSPECTION AGREEMENT FORM_doc7/07 ACKNOWLEDGEMENTS I have read and agree to eomply with the terms and conditions of this agreement. Owner name (please print or type) Signature General Contractor Company/Owner name Signature, Special Inspector/Agency game Signature Arcbitect/Engineer of Record name Signature Date (please print or type) Date (please print or type) (please print or type) Return the original signed agreement to the Building Division City of Edmonds Building Division 1215 th Avenue North, City Hall Second Floor Edmonds, WA 98020 ACCEPTED BY CITY OF EDMONDS BUILDING DIVISION: City Official Signature Title: Date Date Date W_1Buildingl11ANDOUT ICODESIFORMS\SPECIAL INSPECTION AGREEMENT I=ORM_doc7/47