Loading...
20091123131839071.pdfOP E D/It CITY OF EDMONDS il".1111 M'- 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 Erle. I89� *PERMIT POSTED O STATUS: ISSUE Ir0. ,� %/ rr/ /,,, � , ENG20090365 ExpirationD. 1 Im Job Address: 15806 75TH PL, W, EDMONDS PUGET SOUNDSOUND 13330 Stone Ave N PO BOX 2579 Location: Seattle, WA • WA "•: LICENSE 4: EXP: DESGRIPTIQN> Adjacent• 15806 - 75 PI W: Relocate• to avoid • •ming city fi-ontage improvements. ASSESSED VALUE: SIDEWALK: (OXO) PARKING: ( 0X0 ) ALLEY: (0X0) $0.00 PROPERTY AREA: 0 DURATION IN MONTHS: 0 FEE: $0.00 STREET DISRUPTION TRENCH CUT: ( 0 X 0 ) DURATION IN MONTHS: 0 FEE: $0.00 YEAR OF OVERLAY: 0 FEE: $0.00 DURATION IN MONTHS: 0 FEE: $0.00 INDEMNITY- The Applicant has signed an application ivhich states he/she holds the City ofEdmonds harmless from injuries, damages or claims ofany hind or description whatsoever, foreseen or unforeseen, that may be made against the City ofEdmonds or any ofits departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and attorney fees by reason ofgranting this permit. THECONTRACTOR IS RESPONSIBLEFOR WORKMANSHIP AND MATERIALS FOR A PERIOD OFONEYFAR FOLLOWING THEFINAL INSPECTION AND ACCEPTANCE OF THE W O RIS • Traffic Control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possesion. • Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday- NO EXCEPTIONS. • Three sets of construction drawings of proposed work are required with the permit application. CALL DIAL -A -DIG (1800-424-5555) BEFOREANY EXCAVATION CALL FOR INSPECTION (425) 771-0220 EXT. 1326 24 HOUR NO TIC EREQ UIRED FOR ALL INSPECTION REQUESTS THIS APPLICATIONrcNOT''A`PEI NIIT"TIL SIGNED BY THE CITY ENGINEER OR HIS/HER DEPUTY: AND FEES ARE PAID, AND RECEIPT IS ACKNOWLEDGED IN 7 SPACE PROVIDED. Printed: Monday. November ( ) l , RELEASED BY DATE FILE COPYINSPECTOR COPY APPLICANT COPY STATUS: ISSUED ENG2009O365 • Restore ROW to City standards • Restore Landscape to like or better conditions. • Call for locates of underground utilities prior to any excavation. • Alert affected residents and/or businesses prior to work start. • Conform to approved working drawings and Traffic Control plan. • Public utilities maintain 5'separation from City Utilities. • Verify clear bore crossings • Utility patch restoration to be in accordance with Edmonds Standard detail E2.3 • Maintain erosion & sedimentation control. Keep street clean. • Construction hours are Monday -Friday 7am-6pm and Saturdays l0am-6pm. No work on Sundays or Federal Holidays. • Call for required inspections as noted. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the pemnitted project. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt fromthe noise limits of ECC Chapter 5.30 only during the hours of7:00amto 6:00pmon weekdays and 10:00amand 6:00pmon Saturdays, excluding Sundays and Federal Holidays. At all other tones the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents fromany and all claims for damages of whatever nature, arising directly or indirectly fromthe issuance fo this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. • EEngineering Final PARTIAL INSPECTION PARTIAL INSPECTION FINAL INSPECTION APPROVED INSPECTIONS DATE: INITIAL: DATE: INITIAL: DATE: INITIAL: NOTES: NOTES: