Loading...
20091203140032867.pdfPage 3 of 6 11 w MR", Number 03 EECEN EDM 08-90 (3) North Crest 4 -Unit Condo Project Review # 2008-0938 7, 8, 20. AOR, please submit lateral analysis for the horizontal diaphragm. All that was in the submitted analysis was the shear wall design not the diaphragm requirements. Please submit this upon the response. ASCE 12.10. Jhe resf)o n se only ]has &nc hateral analysis for the Wind pressurcand not the seismic. Please suhnit eanhquake diphragm andyis leer le code. The dhphmWn cmalyis MOW is not conva The architect tcwk the. wind loa(J and aprflie�d 4 U) the horizont,"It floon'The Wind isal)plied to the va,,.rdcal Nce Wen distrRmard though the Taplwagni to the venial redsHngdements. 4he fi-)rce is thecae distrit.)uted through the dia[)hraprn, -iot Imsed OWN sqwue area orne ncxw. The wismic Orce is Me .,, i tool base shear diMMaed accordinyjy at cachi Level hased otfl)rinclple and muchanks. Ibis must inc,.lude. the horizontal arum Vertical cle,aId loads, nW just the, noor system omd exterior 'Nall dead loan? Modify analysk; a.Ccordin,.(,,,1y. HY-7 1 604A, Page 4 of 6 Plan Review Number 03 EECE#: EDM 08-90 (3) North Crest 4 -Unit Condo Project Review # 2008-0938 8. 9. 22. The dead load used in the analysis has not included the weight of sprinkler system that is required. Please modify the analysis accordingly and resubmit. The mawa,gaa:aaau:e st.aates the, after i•evicw Hie i;nivitay laaaad [lie sprinhier will not aacId any aadcHt:iona l 10,:ICi JIrw S ii`y .this with :anaa.iysis a.a>r d pu° Mde a b-e<ak down ofthe dead load nyasaa the,, aa;sp;ao nse to paus il� the dead load, The, floor dead load shall iraa:;lrvude all dead loads. S'e e,, below taalale of itci,ns to a~a: nsiaa er Ease an e.v<aua.11..rla 1 lea, aaraaaly,wri., submitted has not included all dead poads fwr the lia:raaa assenibly. Also, note nasus, tloorp ,,is,sa.mbly per (.,M) saurn noted sena : lara.aa:t / 8 is ai l> at° °areal ruaat 2 psf aaas used In the analyg iss lte;mlaa 1olIY" time floor Dead load per T.11 catalog ,Jun e 2007 "a rpet lead, lights etc Used the.5 1"asle lam analysis-. 1"It a"econanaeund.s 1 1111t1F should leen used l &C,' plywood 2W5 111-7/81',11360 (&, 16"Ol/C 2.3 5/8" t,wyla ceiling, (Required 2 layers n,, m (t I'yl.asunm. F((5241 has dead to tad 3 for sane-laa:aaauu° mating 1t.'t.2 l+ SII1 ..11 133(11I1t1'F Ior that assembly but; that is W/o layers of V2" -..see a:assennmbly noted oaa your sheet .8) Insulations .5 Sprinklers 2 Dead Imad Over 13 last ntot. 10 lmsf as use(] in the: design. Alsco, uuaote^ nothing is aalele^d for lanisce;lla'aaacous which should be specified. d. l+or Otis floor asysteama, no Less than 115 la,sl is typically is used. Also, note Inone, o time interior partitions walls vvearem incluided in the dead load. All dead loads naaast be used in the graiIty and lateral de°siguuaa® Page 5 of 6 Phui; Review Number 03 EECE4: EDM 08-90 (3) North Crest 4 -Unit Condo Project Review # 2008-0938 Sheet A3 Foundation Plan 9., 10. AOR, v,ibinitzindysis fiw the extedor stwidard spread fooling to support IN.,. point hod ofthe new I)earns, Ruined amund the ehmator oper9n, Kiduding A &md kmd and live loadof the HoorQind thG floors above thestandard footing does not support lhe design kmAJugti1','y with analysjs.'fh(.n respollse sUACS [Nre is riot any waHs but the dra"Angs show beanis Ramily; OR) Te vmlN that cal G" verthad loady Arl analysis is required for thiese bearns. The QUM are AN 11- 7/8, 1-7/8, Theseare hearing on the shab. 10. JIN: tipper Hoor shows aa. post bearing, on the slal) on girade, below at the devator wall. When tracing the loads LIOW11 born the upper ffloor (his b.)rce lu.is not been Uhvssed in the analysis. Subaiit an analysis to Justify. Sheet A4 Lower Floor Plan 11. law ADif, ialease pvvWe a detail at Te ceMer wall w1 re the l4rallani Manic inu) VIA resp(Hise detAl on AT but there is not a defiail for this connedion. Ne4lSe [V0VidC', [hiS UP011 (Ile 1V`SJ)01T,,e. 12, 14. 1 DR, please yo -vide as detail for the SSW 24X7 since the wall fieighl will exceed the height of the wall plus the beanL Please provide detail on Immy this will be buill. The dnawings havQ'., been modifed to specily as 132-2. This Nvall MH not mccc the mininnan 2 to I ralk, In adldom the 3-1/2analysis fi,,-ts not been submktcd per 113C table 2305.3.4. I'llease aio(fify accordingly. 113C. table 2305,3.4 13. 15. 26 AthR, please specyy the required post to beam connections for GB -2.111c response swe to see notes added to dds Owe, ImA nothing is speclOW A- thh" connecdonk Please clari ( ,y upon the response. This irfl'oranaion has riot been added to the dra"Ags to show the raluired cormeakms and kmd UynsTr Sheet A5 Main Floor Plan 14. 16. 22 ATIJ please specify the required connection of the B-3 to B-4 supporting header beam.'Ths; connectiory is OHI not detail on how the hnds KH tmnslbr. Plense rriodify accordhigly. 014.. 15. 17. 30. AOR, please detail and connection for the beam mark- B3 at the post in the separation of'unitA and UnitB.This deQ is not providcA 111case provide this on the dramdn,, rl he response states see. detait A5. However, there is not a det,,,�H I ciddressing this on sheet A5 Page 6 of 6 Plan Review Nuniber 03 EECE#: EDM 08-90 (3) North Crest 4 -Unit Condo Project Review # 2008-0938 Sheet A6 Upper Floor Plan 16„ 18, 31. AOR, please provide analysis and detail for the deck shown on this sheet. Nothing has been submitted for the deck support. Aii,.Alysis has not beet'i providcd Lo show the force will be transfei'red. Ple,,,ise subi-nit O'lis ul)on the ac iponsc.'[' I'le ,i.nalysis suibt�iitted applied Ildl lo"'Id on bor 'h the bacic spaiu an(] (.,,,ni6Ievetvd ince, is as floor�, c11'en)"Itive hVe lo"'id oii flie sptn,:un(] cau-aflever nienib(T s[iLfll be i.ise€ . avstibniitanzdysisas rcqL6Rcup L 1[3(" l6 7. 10 Sheet L1 IT See coauneu'it ttu'ide,,r genend lor (tic Gpi 4,,.ictor Qo be specflle,(] o�-n. th,. dravvin,,'_,'s. Sheet GI Typical Wall Section Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874- 0562 between 8:00 a.m. and 5:00 p.m. M