Loading...
20100126061925053.pdfUff' i�?... Assod ated Earth Sdences, (nc. 911 Fifth Avenue, Suite 1.00 Kirkland, Washington 98033 425-827-7701 FAX 827-5424 Tlx: Sunset 100 Limited Partnership c/o Real Estate. Capital LLC 16118 72° Avenue West, Edmonds, WA 988026 ATTN: Mr. John Thorsen AS REQUESTED BY Mr. Duane Landsverlc THE FOLLOWING WAS NOTED: Paee i of I ]pate Project Name Project No, 05-2-09 1 Sunset 1.21 KE080122B Location Weather Partly Cloudy, 121 Sunset Ave, Ldnvonds, WA 404E Municipahty Report Number City of Edmonds 14 Engineer/Architect C & G Engineering Clientlowner SUSET 100 Limited Partnership General Contractor/Superintendent Duane Landsverk C Ron Pile Contractor/Superintendent AE.SI arrived on, site to observe progress on the proposed building pad and examine the erosion control measures. Building Foundation The contractor has excavated out the augercast piles and the footprints of the footings and the grade beams. They have begun forming and placing steel in preparation for concrete placernent in the northern most condo structure. Erosion The contractor has a small section in the northwest corner of the site where the slope to the neighboring property is over - steepened. This section along with all the other slopes have been covered with plastic and no significant changes in the slope conditions were noted since our last site visit. RECEIVED MAY 2'009 GINEERNG IAVlSKX2 COPIES Tfl: FIELD REP.: Michael Place P. E. MAILED: 117: MAY r7009DATE PRINCIPAL I PM: Bruce Blyton , r