Loading...
2010-0168 Hamburger Harry's Plumbing.pdf City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: March 24, 2010 TO: Ron Johnson ronmaile@verizon.net FROM: Leif Bjorback, Assistant Building Official RE: Plan Check: 2010-0168 Project: Hamburger Harry’s Plumbing th Project Address: 610 5 Ave S During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to Theresa Umbaugh, Senior Permit Coordinator. Thank you. 1.Please label on the plans which plumbing fixtures are new and which are existing. 2.Please indicate on the plans that an RPBA (reduced pressure backflow assembly) is required at both soda dispensers, the glass washer and the ice maker. 3.An RPBA will be required on the coffee machine unless it will have an approved air gap. 4.Please indicate the type of backflow protection at the mop sink. This will need to be either an RPBA, or a hose with air gap. 5.Provide specifications on the glasswasher. A Type 2 exhaust hood may be required depending on the amount of heat and steam produced.