Loading...
20100203093007996.pdfCity of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION — 1011) 1010 (425) 771-0220 DATE: 2/3/2010 TO: CG Engineering Attn: Joe Galusha 250 4th Ave. S, Suite 200 Edmonds, WA 98020 RE: Plan Check: BLD2010-0037 Project: Jackson Retaining Wall Project Address: 1101 12th Ave. N During the second review of the resubmitted plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a Permit Coordinator. 1. See attached City of Edmonds consulting engineer's structural plan review comment letter. 2. It appears that there is a discrepancy between the Soldier Pile Concrete mix design minimums at the structural notes, Concrete/Grout S 1.1 and detail 4/S2.2. It looks as though the note may have the lean concrete above grade, instead of below grade. Please verify which is correct. 3. The attached city Special Inspection and Testing Ageement for Soils will need to be completed prior to permit issuance. Pat Lawler patrick.lawler@ci.edmonds.wa.us Plans Examiner 425 771 0220 x 1703 Eagle Eye Consulting Engineers, P.S. PO Box 523 01alla, WA 98359 hoytjeter@centurytel.net 360 874 0562 Fax 360 874 0591 To: Leif l3jorback 121 5th Ave N Edmonds WA 98020 Re: Jackson Retaining Wall 1101 12t" Ave N Edmonds, WA Plan Review # 2010-0037 EECE # EDM 10-01 Plan review number 01 Task order 10-02 The above referenced project is in the process of plan review for compliance with Edmonds ordinances and applicable codes. The following comments, deficiencies/corrections must be addressed prior to completion of plans review and subsequent issuance of permits. Provide revised plans and calculations along with a written response to each of the items listed below to facilitate a shorter back -check time. SCOPE OF REVIEW The scope of this review is for the Structural requirements of this project. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. Page 2 of 2 Plan Review Number 01 EECE#: EDM 10-01 Jackson Retaining Wall 2010-0037 2 "1 .11� �W 117- 903 0 101140 Sheet 52.1 Retaining Wall Plan and Profiles 1. Engineer of Record (EOR), please provide a detail showing the timber lagging shall be placed at the comer where the wall change directions. Sheet 52.2 Sections and Details 2. EOR, please specify the minimum required bearing area or specify the distance the timber lag shall be placed from the web of the wide flange beam. Additional corrections may be required following receipt of corrections and additional information as requested. Your plans are being reviewed concurrently with the Building Department, Fire Department, Zoning Department and Public Works Engineering. Changes, clarifications or additional corrections may be required subsequent to the Building Department plan review when comments are received from the other concerned departments. Should you have any inquiries regarding this letter, please contact Hoyt Jeter at (360) 874-0562 between 8:00 a.m. and 5:00 p.m. I'm Hoyt Jeter, P.E. President PERMIT# CITY OF EDMONDS SPECIAL INSPECTION AND TESTING AGREEMENT FOR SOILS PROJECT SITE ADDRESS: SPECIAL INSPECTION AGEfX7" *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project in accordanc with IBC Chapter 17 or in accordance with IRC R109.2 as applicable. IBC Section 1704.1 requires th owner or the registered design professional in charge to employ an independent testing/inspectio agency/special inspector to perform required special inspections. The independent agency hired t 'I perform the duties of special inspection is required to be a registered agency with WABO under th Special Inspection Registration Program (SIRP). The special inspector shall be a qualified person wit c ompetence for inspection of the particular type of construction or operation requiring special inspectio (SOQ may be required by the Building Official). The owner, registered professional, contractor an special inspector/agency shall complete the attached form and submit directly to the Building Division. WORK REQUIZING SPECIAL INSPECTION: Special inspections will be required for the following categories of work in accordance with IBC Chapter 17 and IRC R109.2: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF- SPEC14L Ei Soils (1704.7) ii Soil Bearing Verification • Structural Fill and Compaction • Foundation and Site Drains Ei General Site Monitoring during Wet Weather construction p Temporary Erosion Control o Final Erosion Control Ei Temporary Shoring Ei Permanent Shoring ii Piling, Drilled Piers, and Caissons (1704.8, 1704.9) Ei Pier Foundations (1707.5) • Site retaining wall/ rockery construction • Final letter from geotechnical engineer of record I& A 5 f4 114" Y.;0 Ad L:\TEMP\BUILDING\FORMS\Inspection\SpeciaI Inspection Agreement Soils. doc 12/09 BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached Special Inspection Information Form, including the required acknowledgements and return to the Building Division for approval prior to permit issuance. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Official prior to performing any duties or inspections. The company performing inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifleations to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections are permitted only as specifically noted in the approved project plans in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifications, and approved by the Building Official. 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official by telephone at (425-771-0220) or in person at City Hall, of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect of record. 3. DAILY REPORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inspections. The daily reports shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: 0 Description and date of daily inspections and tests made with applicable locations 0 List of all non -conforming items and locations 0 Report on status of non -conforming items (how each was resolved or unresolved) 0 Field changes authorized by the Architect, Engineer or City Inspector if not included in non-conformance items. L:\TEMP\BUILDING\FORMS\Inspection\SpeciaI Inspection Agreement Soils.docl2/09 5. FINAL CONSTRUCTION REPORT The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities 1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division Responsibilities 1. APPROVE SPECIAL INSPECTION The Building Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE OF OCCUPANCY, The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted by the City. D. Owner Responsibilities 1. The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities 1. Prepare Statement of Special Inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. L:\TEMP\BUILDING\FORMSIInspection\Special Inspection Agreement Soils.doc 12/09 ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner name (please print or type) Signature General Contractor Company/Owner name Date (please print or type) Signature Date Special Inspector/Agency name (please print or type) Signature Date Architect/Engineer of Record name Signature, (please print or type) Date Return the original signed agreement to the Building Division City of Edmonds Building Division 121 Stn Avenue North, City Hall Second Floor Edmonds, WA 98020 City Official Signature, Title: L:\TEMP\BUILDING\FORMS\Inspection\SpeciaI Inspection Agreement Soils.doct2/09 Date L:\TEMP\BUILDING\FORMS\Inspection\SpeciaI Inspection Agreement Soils.docl2/09