Loading...
20100310110745850.pdfMassey Construction wv, r 7r 141 Final inspection report for 6a6 Glen St., Edmonds, WA, townhomes Diane Glewi All inspections performed at the project were based on the builder's specifications, product manufacturer's specifications, and project plans. All references made are to the plans and specifications developed specifically for the Glen St. TownhOlneS. Inspections were performed on a continuous basis frorn framing stage of construction through completion of exteriors by The Construction Consultants for inspection of correct application of exterior inaterials during the construction process. Areas of potential water intrusion into the building were of particular concern. A -final inspection was performed of the entire project for the purpose of identifying any outstanding items. All work was complete and no outstanding items existing at final inspection. This report specifically identifies all areas covered in the inspection process. Frain' Atm_ - Exterior framing sheathing inspected for consistency in application of siding material. All area inspected were observed to be completed with no outstanding correction items. Windows and sliding doors: Window and sliding doors inspected for installation per product manufacturer's and builder's specifications. Windows and sliding door nailing fin caulked before installation. Windows and sliding doors installed with nailing to manufacturer's specifications. All area inspected were observed to be completed with no outstanding correction items. Man Doors: Man doors inspected for installation per builder's specifications. All sill areas inspected for correct scaling against water intrusion. Doors installed with flashing detail and sealed at threshold area. All area inspected were observed to be completed with no outstanding correction items. Flashing, Flexible flashing at windows and doors inspected for correct application per builder's specifications and product manufacturer's specifications. Windows and sliding doors flashed with Waterblock flexible flashing staple on before window and door sets. Self-adhesive flashing piece installed into sill of windows. All area inspected were observed to be completed with no outstanding correction items. Building paper inspected for correct application per builder's specifications and building code. Consultations were performed in the field to assure siding company had a clear understanding of procedure and a consistent follow through. Fortifiber Jumbo Tex 60 minute paper was installed with 18" to 20" overlaps creating a double layer of papering on the entire wall area. Paper was installed at inside and outside comers a minimum of 12". Paper was installed under the bottom flashing piece and over sides of flashing. An additional piece of self-adhesive flashing was installed at the sides over the paper and window flange. All area inspected were observed to be completed with no outstanding correction items. Decks: Deck flashing inspected for correct application of flashing at deck edges to assure prevention of water intrusion. Decks inspected for deck surface material application to manufacturer's specification. Metal deck flashing installed at deck surface to wall with correct overlaps. Metal installed consistently along the door and into the door sill. All area inspected were observed to be completed with no outstanding correction items. Sidin All siding and trim inspected for correct installation per product manufacturer's and builder's specifications. Inspections performed for complete application of all siding pieces and trim. Cedar horizontal siding installed with areas of cedar shakes. Belly bands installed with metal flashing at top of band. All area inspected were observed to be completed with no outstanding correction items. Roofing flashing: Roof flashing inspected for correct installation at all required locations before installation of composition roofing. All flashing at eaves inspected for correct application by product manufacturer's and builder's specifications and building code. All area inspected were observed to be completed with no outstanding correction items. Other: Attached photos represent examples of window flashing material application, deck metal application, building paper application and siding application. All exterior material applications are completed to builder's specifications, manufacturer's specifications and good building industry standards. Submitted byz,/- Z2i a n eeGlenn The Construction Consultants