Loading...
20100601122836898.pdfROAD CONSTRUCTION AHEAD (W20-1) ONE LAN>(W20-4) ROAD AHEAD (W20-7 A) SEE NOTE 1 • SEE NOTE 1 • SEE NOTE 1 SIOV SPEED (MPH) TAPER LENGTH (FT) OFFSET WIDTH 10' 12' CONE SPACING ALONG TAPER (FT) 25 105 125 25 30 150 180 30 35 205 245 35 40 270 1 320 40 45 j 450 1 540 45 J®TE: 1 DISTANCE BETWEEN SIGNS SHALL BE 100' FOR RESIDENTIAL STREETS (25 MPH), AND 200' FOR ARTERIAL ROADWAYS • FLASHING BEACON SHALL BE INSTALLED AT EACH SIGN FOR NIGHT-TIME USE. DISTANCES MAY VARY AS APPROVED BY THE ENGINEER. • FLAGGERS REQUIRED TO CONTROL TRAFFIC WHENEVER THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE WORK SITE . WITH MATERIALS OR EQUIPMENT. • SIGN SIZE PER MUTCD. EB CONE OR CHANNELIZING DEVICE (SEE STD 713) 1'71 /C/ e t 1 1 1 t I I I 1 1 1 I I I 1 i 1 I 1 1 I lO WORK AREA t TRUCK WITH FLASHING OR WITH <S> BEACON Ip O T I o 1 1 I TAPER LENGTH (TABLE A) t Rl I 1 I 1 SEE NOTE 1 1 t j (W20-7 A) SEE NOTE 1 I t ONELANE t ROAD AHEAD SEE NOTE 1 (W20`4) I 1 ROAD I CONSTRUCTION i AHEAD (W20-1)