Loading...
20100903075027601.pdfROOF IE]yVG1AwIEIE1l 1AyTG 717IECHIAVOILOGINES,. LLC Analysis, Design, and Management August 16, 2010 Dennis Derks SOUND ROOFING SERVICES 18908 Highway 99, Suite B Lynnwood, Wa. 98036 RE: Summit Place Condominiums Roofing Replacement Dear Dennis, On behalf of the Association this letter confirms that your proposal of July 23, 2010 for the sum of $92,796.00 for the roof replacement on the 8503 Bowdoin Way building in Edmonds, Washington has been accepted and you may proceed with the organization of work and ordering of materials. This cost represents the $1,70.0.00 deduction from $94,496 for reuse of all coping metal. Contract documents include in addition to this award letter, the specifications and drawings as prepared by Roof Engineering Technologies dated July 8, 2010. However, you are to do no actual physical work on the site until we have received your certificate of insurance form and product submittals, as required by the specifications. After these have been received, and found acceptable, we will then authorize you to start work in accordance with the terms of the contract documents. Please contact this office to arrange a preconstruction meeting at the site. A contract is being made now and will be sent to you for signatures soon. Sincerely, Michael. Jo , P.E. for Summet Place HOA Roof Engineering Technologies, LLC Date Copy: File; Letitia Gray, SPC 16007-67 1h Lane N.E., Suite 4, Kenmore, WA. 98028 (425) 806-5458 Fax (425) 483-5596 in -11M1, OC w �n�0 City of i �c� i � development information -- �sr, 1890 Permit Submittal Requirements,,, PERMIT REQUIRED: A permit is required for replacement, adding a layer, or tear off for new roof coverings. For example, shake roofing removal and new composition roofing installed, or adding an additional layer of composition roofing to an existing composition roof or hot mopping an existing asphalt roof. International Building Code 2006 Edition International Residential Code 2006 Edition FEE: Single Family: Flat fee for straight removal and replacement of roof material. When structural changes are required (including replacement of sheathing) the fee is based on a licensed contractor's bid. Please refer to City fee schedules Commercial/Multifamily: Fee is based valuation. Provide licensed contractor's bid. Please refer to City fee schedules SUBMITTAL REQUIREMENTS: 1. Permit Application Form. A (indicate the existing and proposed roofing material i.e.: wood shake, composition, tile, etc.) and the number of existing layers. 2. When installing a heavier weight roofing material than what is existing (example, wood shake to tile) provide the manufacturer's specifications, weight per square and a roof framing plan. 3. When framing members (sheathing, rafters, trusses) are added or replaced, submit a roof framing plan. 4. When insulation is being removed, replaced or added, indicate the existing and proposed R -value of insulation. NOTE: the State Energy Code requires that when exterior cavities are exposed they must be insulated to the maximum extent possible. 5. Edmonds is located in seismic design category D2 which does not allow spaced or skip sheathing (IRC 803.1). Existing roofs with skip or spaced sheathing must be solidly sheathed in accordance with Table R803.1 (i.e. minimum 1/2" plywood or 7/16" OSB where roof members are spaced 24"o.c.) or provide structural calculations stamped and signed by a Washington State Licensed Professional Engineer justifying the spaced sheathing. 6. For Commercial or Multifamily Projects: Provide all of the above (when applicable) including: a. Existing and proposed color of roofing material and roofing covering classification. NOTE: A change in color must receive Design Board approval or Planning staff waiver. (See Hondout #P7) b. If roof mounted mechanical equipment will also be replaced or relocated, a separate mechanical permit is required. (See Handout #B52) Note, a condition of permit approval can be the screening of existing and replaced roof mounted equipment. C. Compliance to RCW 64.55 for Building Enclosure documents required unle an exemption c be proven. C) cos' r 2S INSPECTION REQUIREMENTS: When structural framing members are replaced an inspection is required prior to cover. For inspection of exterior sheathing, contact the City Building Inspector at 425-771-0220 extension 1333 to coordinate inspections before starting the job. Revised 6/2009 Summit Place at Edmonds, a Condominium 2010 Assessed Value Total all units $3,007,000 Assessed Value Unit # Address $245,000 100 8503 Bowdoin Way, #100, Edmonds, WA 98026 186,000 101 8503 Bowdoin Way, #101, Edmonds, WA 98026 245,000 102 8503 Bowdoin Way, #102, Edmonds, WA 98026 245,000 103 8503 Bowdoin Way, #103, Edmonds, WA 98026 186,000 104 8503 Bowdoin Way, #104, Edmonds, WA 98026 186,000 105 8503 Bowdoin Way, #105, Edmonds, WA 98026 264,500 106 8503 Bowdoin Way, #106, Edmonds, WA 98026 191,000 201 8503 Bowdoin Way, #201, Edmonds, WA 98026 264,500 202 8503 Bowdoin Way, #202, Edmonds, WA 98026 264,500 203 8503 Bowdoin Way, #203, Edmonds, WA 98026 186,000 204 8503 Bowdoin Way, #204, Edmonds, WA 98026 186,000 205 8503 Bowdoin Way, #205, Edmonds, WA 98026 357,500 206 8503 Bowdoin Way, #206, Edmonds, WA 98026