20100915082516617.pdfLawler, Patrick
To: PKDPHIL@COMCAST.NET
Subject: Bettinger BLD2010-0151
Hi Phil,
I finally got a chance to look at the revised plans for the roof change, and we still have a problem. The plans do
not match what was done in the field, so it would mean a lot of crowbar and cat's paw work to get the structure to
match the plans. It might be best to accurately depict field conditions and see if the engineer can get them to
comply with code. We will need engineering calculations to go along with either option.
Pat Lawler, CBO
Plans Examiner/Building Inspector
City of Edmonds