Loading...
20101019063748565.pdfCity of Edmonds 121 5"' Ave. North Edmonds,' A 98020 6621 Foster Slough Rd. Ph: 425-334-9980 Snohomish, WA 98290 Fax: 425-334-7380 e-mail: donnabreske@corncast,net Subject: Direct Drainage Discharge to Puget Sound Reference: Michael & Nancy Gold, North Residence 7510 162nd ST. S.W., Edmonds, WA 98020 Please find attached a narrative prepared by this engineer and information from city records which concludes that on-site detention for the above referenced project is not The site is in very close proximity to Puget Sound and a Meadowdale: Drainage Investigation Report prepared in April 2000 by R.W. Beck concludes the piping conveyance systems within the drainage basin have adequate capacity for full build -out of I 00 -year peak. flows. As a result on-site detention is not proposed for the development of the site. Sincerely, Donna L. Breske, P.E. VE� U 'T11/111"J" "A" HAINES k WHARF SITE CD Lo LLJ PLAYFIELDS . ..... ..... . . .... . .. . . . ..... ......... ... .. ... . ... .. 168TH ST. SW VICINITY MAP MIKE & NANCY GOLD., NORTH HOUSE 7510 162n d ST S. W. EDMONDS, WA 95020 swi DIRECT DRAINAGE DISCHARGE TO PUGET SOUND MICHAEL, & NANCY GOLD — SINGLE FAMILY HOME -NOR] 7510 162 ID ST. SW, EDl' ONDS, WA 98020 o/1" APRIL 5, 201 0, Iur�t; The 1992 DDE Manual Minirnurn Requircrnent #r5; Strearnbank Erosion Control applies only to situations where stormwater runoff is discharged directly or indirectly to a stream.. Thus, per the 1992 DOE since discharge from this site does not enter a strearn, no detention is required. Furthermore, per the city of Edmonds detention system 'fro new impervious area may be eliminated, if the site is in close proximity to Puget Sound, and if it can be dernonstrated that the downstream pipe conveyance system, which outfalls to Puget Sound, has sufficient capacity to accept the un -detained flows. p 03KW1!_V72 Per Meadowdale Drainage Investigation prepared by R.W. Beck and dated April 2000, the pipes in Basin "D" and down to Maines Wharf have adequate capacity for full build -out -1070 -year peals flows. The subject site lies within Basun "D" of the R.W. Beck Report, (see attached map from the Report), Specifically, Section 3, Fuge l I of said report states, "All of these pipelines in Basin "D" and down to Haines ''Wharf have adequate capacity for full build -out. 100 -year peak flows. The site is located at 7510 162n' ST S.W. just uphill of Haines Wharf. The west boundary of the site is approximately I00 -feet from the edge of the water of Puget Sound.. A single family horne is proposed for construction on the site. Access to the site is currently from 162nd Ave S.W. and will continue to take access frorn the same point. Currently, no structures exist on the site. An existing driveway bisects the site for access to an unoccupied and uninhabitable hawse to the south. This driveway is proposed to be removed. The house to the south is proposed to be demolished and a new access provided from 75`' PL. W. will be used. Michael & Nancy Gold -North House -Direct Storm Discharge FURTHER DISCUSSION OF R.W. BECK DRAINAGE INVESTIGATION: Per the R.W. Beck Report the flow for the 100 -year full build -out of Basin "D" is calculated at 7.8 cfs. Additionally, per the R.W. Report, the existing conditions, April 2000, for the 100 -year storm are 4.2 cfs. (See Table 2, Stormwater Peak Flows from the R.W. Beck Report). For this project, coupled together with the adjacent Mike Gold project to the south, an additional 0.14 cfs for the 100 -year storm will be added to Basin "D". (See attached Water Works Calculations and supporting Exhibits prepared by this engineer). This 0.14 cfs adds to the April 2000 calculated 100 -year rate of 4.2 cfs, and contributes to a portion of the overall 100 -year full build -out rate of 7.8 cfs as identified in the R.W. Beck Report. DOWNSTREAM PIPING SYSTEM DISCUSSION: Storm drainage flows from the site will be connected to an exiting catch basin which is labeled 1-90 within a Basin Map from the R.W. Beck Report and attached herein. Flows will be directed downhill to the west in a 15" CMP pipe segments within the city right-of-way of 162"d Ave. S.W. Then the flows will enter a catch basin and head north in another 15' CMP in the city right of way of 75th Ave. W. at which point they enter another CB and are directed to the west. From this CB, the pipe increases to a 36" CP and travels under the BNRR and outflows to Puget Sound. Prepared By: Donna L. Breske P.E. Phone: 425-334-9980 Michael & Nancy Gold -North House -Direct Storm Discharge m A Iso! . ......... ............... .................. .......... . .... . ......... ...... ............. ............. , " 'y' .................... . .............. .. . . .......... ................. .............. ': ---- - --------- ......... .......... . . ........... ............. E . .......... ! . ................ ---------------- ....... .............. ...... .... .......... f ............ .......... 7 WU ..... ..... MEADOWDk-E COUNTY PARK .......... O SUBBASIN DESIGNATION SUBBASIN BOUNDARY SLIDE BOUNDARY 500 SCALE IN FEET FIGURE I CITY OF EDMONDS, WASHINGTON MEADOW13ALE DRAINAGE INVESTIGATION STUDY AREA MAP 0 w 07 G 0 fIS 6. eu C Q1 ro 0 73 m (D Oy] 0 Z c (Q D y � O CD CD CD Q. -0 E a) cu e � Q r 0 as � V C C NCD Ly O a) c m a3 E O a) a) !] CL O C O ti _ 00 m o Efx CD y� En Q) a) C6 >� L C � m C Ca � "4 30 je 0 c o U 0 m oa) � � 0 D V E T) d) .— Ql a G r Cr) LCi LL U LL r N M E E E T � � N Y O ++t N 0 0 0 = o m IDa+ v ❑❑❑ lL ❑ O n tC V r N rn ao n N d 4 O M r r N n M '�i• T � Vr C 0 C.) M n Ln O M r Q% tom. r r Lo N N d r U-) c.4 M N 4 � r V C N N [7) M C9 f+ N 01 N M � C? ap O v: M o (D N co 47 r -- C\1 N M U n f- O o u to I C7 O Q N M M r Ul O 6 CD U v G tom!) sr r M (n r M Lf) OQ M r x 4 Cf O O D r O r O O Eli N V GO� > to a > ao L a Q a a L ¢ llj Vy Q .0 L .0 L r c •- w- c n n n r ti rn n � n N CR (O (D r q U7 V� CD oD N N R y O c'7 .- ao M C] N 0 o L Cf) coN V Ln � m + G m m - J3 cu .}-- r cts mm G 7cli ca 0 N N m LCI U M M .3 M N r + ¢ CO m m in U ❑ U w LL in G .N co < LL) U ❑ w w Oy] 0 Z c (Q D y � O CD CD CD Q. -0 E a) cu e � Q r 0 as � V C C NCD Ly O a) c m a3 E O a) a) !] CL O C O ti _ 00 m o Efx CD y� En Q) a) C6 >� L C � m C Ca � "4 30 je 0 c o U 0 m oa) � � 0 D V E T) d) .— Ql a G r Cr) LCi LL U LL r N M 4 FINDINGS AND RECOMMENDATIONS from the south (Subbasin 0). Portions of this branch precede the 1984 work and are in fair condition. The branch cuts across the valley bottom and was intended to collect at least a portion of a small stream. The area also appears to be a small wetland and has been reported as a seepage area. The vegetation and deposition is limiting the effectiveness of this line, eliminating any inflow from the stream and perhaps allowing outflow from the system. Although it is no longer desirable to collect the stream flow, the system should be cleaned to prevent outflows. Installation of solid catch basin/manhole covers would stop collection and would reduce maintenance. s The small stream is collected into the North Meadowdale Road trunk at the west end of the subbasin (see Report Map). The intake for the small stream now has a small trashrack that is subject to clogging. A replacement trashrack and headwall is recommended to ensure better collection. Overflows down North Meadowdale Road have been reported. A detail of a trashrack and headwall with adequate surface area is shown in Appendix C. Two other inlets lie on the north side of the North Meadowdale Road trunk. Both should have larger trashracks installed. Six seepage or wet areas were identified during the 1984 work. One, discussed above, should remain as is. Another is currently being eliminated by construction of a house (16123 North Meadowdale Road). The area at 16119 North Meadowdale Road is very small. The area near 1591.0, 15917 and 15920 72nd Avenue W appears to be adequately handled by private french drains. Both slides and- seepage have been reported on the Johanson property. The slides did not involve public property or drainage facilities. The uphill property owner, Mrs. Glantz, reportedly installed the additional drainage system requested by the City. Slope stability at this location remains the responsibility of the property owners. This property was the location of the stream prior to road and pipe installation. It still rests in the low point in the valley. Seepage in this area is to be expected. Elimination of seepage here would require that seepage following the topographic bottom of the valley would have to be collected. This would require a very deep french drain that would not be cost effective. BASIN D Basin D covers 21.5 acres and includes the steep and moderate slopes between 72"d Avenue W and 75' Place W Seepage is heavy along the steep slope in the middle of the basin. The basin is partially developed, probably inhibited by steep slope and stability concerns The existing collection system includes both surface and groundwater components. Three separate groundwater collection systems lie along the slope. These feed into a surface system along 75" Place W. Flow from Basin D combines with flow from Basin C near Haines Wharf and discharze to Puzet Sound in a 36 - inch RCP. I All of these pipelines in Basin D and down to Haines Wharf have ade� auate capacity for full build -out 100-vear weak flows. X0017T 321 4A 710 0 R. W. Beck 3-11 1473 SF 1 7510 162nd ST. S.W. I i 3889 SF v ' L16220 DETENTION SYSTEMSUB-BASINBOUNDARYAREA=28,300 SF TOTAL IMPERVIOUS AREA = 13,930 SF 0.32 AC CN=98 TOTAL PERVIOUS AREA = 14,390 SF 0.33 AC CN=86 2327 SF FROM ECDC 18.30.010 DEFINITIONS SECTIONS CC, RR, & TT P2 = 1.5 IN PER 24 -HR P10 = 2.5 IN PER 24 -HR P100= 3.0 1N PER 24 -HR DEVELOPED CONDITION -IMPERVIOUS AREA EXHIBIT MIKE COLD PROJECTS 4-2-10 sF DETEN770N SYSTEM„ 'SUB -BASIN BOUNDARY AREA=27,965 SF L -L Z c "s FROM ECDC 18.JD. 010 DEFINITIONS SEC77ONS CC, RR, & TT P2 = 1.5 IN PER 24 -HR P10 25 IN PER 24 -HR TOTAL 4 ERWOUS AREA 27,965 SF P1O0= 3.0 IN PER 24 -HR 0.642 AC CN=85 TIME OF CONCENTRATION PRE-I)EVELOPEO SITE EXHIBIT MIKE GOLD PROJECTS 4-2-10 3/15/10 1:40:10 pm page 1 "2 Mike Gold Meac%owdale, 75th Ave W. .BASIN SUMMARY BASIN ID: A10OX NAME: 10O YR 24HR EXISITNG SBUH ME'T'HODOLOGY TOTAL AREA.......: 0.64 Acres BAS]EFLOWS: 0.00 cfs RAINFALL TYPE...,: TYPEIA PERU IMP PRECIPI'T'ATION....: 3.00 inches AREA..: 0.64 Acres 0.00 Acres TIME IN`T'ERVAL....: 10.00 min CN....: 85.00 0.00 TC..... 20.55 min 0.00 min ABSTRACTION COEFF: 0.20 BEAK RATE: 0.18 cfs VOL: 0.08 Ac -ft TIME: 480 min BASIN ID: AIOX NAME: 10 -YR 24 HR EXISTING SBH'H METHODOLOGY TOTAL AREA........: 0.64 Acres BASEFL+OWS: 0.00 cfs r RAINFALL TYPE....: T'YPETA DERV IMP PRECIPITATION .... : .IME INTERVAL....: 2.50 inches AREA..: 0.54 Acres 0.00 Acres 10.00 min CN....: 85.00 0.00 TC....: 20.55 min 0.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.12 cfs VOL: 0.06 Ac -ft TIME: 480 min BASIN ID: A2X NAME: 2YR, 24 HR EXISTING SBUH METHODOLOGY TOTAL AREA.......„ 0.64 Acres BASEFLOWS: 0.00 cads RATNF°A,LL TYPE.... TYPEIA DERV IMP PRECIPITATION....: 1.50 inches AREA..: 0.64 Acres 0.00 Acres TIME INTERVAL....: 10.00 min CN....: 85.00 0.00 TC....: 20.55 min 0.00 min ABSTRACTIONCOEFF: ' 0.20 TcReach - Sheet. L: 41.00 ns:0.4000 p2yr: .1.50 s:0.2380 TcReach - Sheet L: 18.00 ns:0,.4000 p2yr: 1.50 s:0.4440 TcReach - Sheet L: 52.00 ns:0.4000 p2yr: 1.50 s:0.1150 TcReach - Sheet L: 19.00 ns:0.4000 p2yr: 1.50 s:0.2000 PEAK RATE: 0.04 cfs VOL: 0.02 Ac -"ft TIME: 490 min "2 c - ( i� 4/2/10 2:3:21 pm Meadowdale, 75th Ave W. Mike Gold BASIN SUMMARY page 1 BASIN ID: B100D NAME: IOOYR, R4 HR DEVELOPOED SBUH METHODOLOGY - TOTAL AREA.......: 0.65 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE....: TYPE1A PERU IMP PRECIPITATION....; 3.00 inches AREA..: 0.33 Acres 0.32 Acres TIME INTERVAL...,: 10.00 min CN .... : 86.00 98.00 TC..... 6.30 min 6.30 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.32 cfs 7 VOL: 0.12 Ac -ft TIME': 480 min BASIN TD; B10D NAME: 10 YRT, 24HR DEVELOPED SBUH METHODOLOGY TOTAL AREA........ 0.65 Acres BASEFLOWS: 0.00 cfs RAINFALL tYPE .... : TYPEIA PERV IMP PRECEPITATION....: 2.50 inches AREA..; 0.3,3 Acres 0.32 Acres Ilk IME INTERVAL....: 10.00 min CN....: 86.00 98.00 TC..... 6.30 min 6.30 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.25 cfs VOL: 0.09 Ac -ft TIME: 480 min BASIN ID: B2D NAME: 2YR, 24 HR DEVELOPED SBUH METHODOLOGY TOTAL AREA ........ : 0.65 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE....: TYPEIA PERU IMP PRECIPITATION....: 1.50 inches AREA..: 0.33 Acres 0.32 Acres TIME INTERVAL....: 10.00 min CN ... : 86.00 98.00 TC .... : 6.30 min 6.30 min ABSTRACTION COEFF: 0.20 PEAK RATE, 0.12 cfs VOL: 0.05 Ac -ft TIME: 430 min