Loading...
20101108113923797.pdfAssociated Earth Sciences, Inc ® ® N 911 Fifth Avenue, Suite 100 Kirkland, Washington 98033 425-827-7701 CAS£ 827-5424 TO: Clearwater Homes LLC P.O. Box 432 Marysville, WA 98270 ATTN: Burt McCormack AS REQUESTED BY THE FOLLOWING WAS NOTED: ,.�, .1.� Jk1 DPD No. Pace 1 of 1 ]nateProject Name Project No. 814110 Falcon Ridge Lot 4 KEI00080A Location Weather 80f 240'1' St. SW Dr Municipality Report Number Edmonds I 9A Engineer/Architect West Group Inc. Client/Owner Clearwater Homes LLC, General Contractor/Superintendent Grading Contractor/Superintendent Subsurface Drainage AESI arrived on site to observe construction activities on Lot 4 at the above referenced site. At the titne of our arrival, the house foundation and stern walls had been placed, We also observed that perforated PVC pipe had been placed around the foundation perimeter and that water proofing had been applied to the foundation walls. Cut._ sloe During our visit we also observed the cut slope on the west aide of lot 4. Soils in the cut typically consisted of dense, brown, silty, gravelly sand. In our opinion, the slope appeared to be stable in is present configuration. OCT 26 71'°' COPIES TO: Distribution a FIELD REP.: w.� PRINCIPAL / PM: MAILED: 0 C T 2 12010 Jon N. Sondergaard, P.E.G. 511 MAvm,,e. SWta 100 Associated laarth Sciences, Inc. Kid&A WA 98033 425-827-7701 MX495.827-5` U FIELD REPORT FIELD REPORT #7.-� To: wA q829,0 ATTNI 'dw-d- /Ube Cor AS REQUESTED 8Y: �[� 4 THE FOLLOWING WAS NOTEDS 2911 % Flewht Avenue • Suite 2 Everett, WA 98201 425-259-05.22 FAX 425 -252 -NOB PAGE I OF l Data ..17 -zt 10 Pro Naim e� Pro eaNa. o6 -6&0A Locallon S-blo AWnic #Y 6 .permit Wasineer/Archifect Client Owner General Contractor Sup. nhn nt oaXw—*rk Contracter/Superintendent F -04 E o 1oA sc - O 5 serer. sn D kW73 fsd.i-C C49� W I Q l 4tlt1 ` SIci o r- JO W L 61!14 t&A ✓1 0%J r FIELD COMPACnoN EQUIPMENT uTIums AREAS OF ADOMONAL CONCERNS ADDITIONAL TESTS REQUIREDt ❑ YES NO WNRRGP COPIES TOS DATE MAILED: 'OCT 2010 ' Field Report subject to review by AESI Project Manager FIELD UP: �A Ac e►`�IGrtel . L�E.(s ,� •PROJECT MANAGER:,WQI AESLFRL rev 312006